Worked example
Example: Primary plus WAS, 75 % to 58 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Volatile fraction of feed solids | 75.000 % |
| Volatile fraction of digested solids | 58.000 % |
| Feed dry solids | 12,000 kg/d |
Applying the formula below gives:
| Result | Value |
|---|---|
| Volatile solids reduction | 53.968 % |
| Total solids reduction | 40.476 % |
| Digested dry solids | 7,142.9 kg/d |
| Volatile solids destroyed | 4,857.1 kg/d |
Open this example in the calculator and change any input.
Formula
\(R_{VSS} = \frac{W_{VS,f} - W_{VS,d}}{W_{VS,f} - W_{VS,f}W_{VS,d}}, \quad M_d = M_f\frac{1 - W_{VS,f}}{1 - W_{VS,d}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(W_{VS,f}\) | Volatile fraction of feed solids | - |
| \(W_{VS,d}\) | Volatile fraction of digested solids | - |
| \(M_f\) | Feed dry solids | kg/s |
| \(R_{VSS}\) | Volatile solids reduction | - |
| \(R_{TSS}\) | Total solids reduction | - |
| \(M_d\) | Digested dry solids | kg/s |
| \(VS_{destroyed}\) | Volatile solids destroyed | kg/s |
Method and standards
Van Kleeck volatile solids reduction.
Where it is used
- Digester performance and biosolids classification.
- Gas production estimates.
Common mistakes
- Subtracting volatile percentages directly.
- Using it with supernatant decant.
Assumptions and limits
- Fixed solids conserved.
Questions and answers
Why can't I just compare volatile percentages?
The total solids also fall, so 68 % to 50 % volatile is not an 18-point loss; per kilogram of feed it is 0.68 to 0.32 kg, a 53 % reduction.
When is Van Kleeck unreliable?
When grit accumulates, supernatant is withdrawn or fixed solids are added (for example lime or ferric), because the fixed solids are then not conserved.
What do the defaults represent?
An illustrative case: Primary plus WAS, 75 % to 58 %. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 13-9, eqs. 13-15 and 13-16 and Example 13-6