Worked example
Example: 30 m2 sand filter. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Filter bed area | 30.000 m² |
| Backwash rate | 40.000 m/h |
| Backwash duration | 10.000 min |
| Filtration rate | 10.000 m/h |
| Filter run between washes | 24.000 h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Backwash flow | 1,200.0 m³/h |
| Water per wash | 200.00 m³ |
| Water filtered per run | 7,200.0 m³ |
| Share of filtered water used for washing | 2.7778 % |
Open this example in the calculator and change any input.
Formula
\(\dot V_b = A v_b, \quad V_b = \dot V_b t_b, \quad x = \frac{V_b}{A v_f t_r}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Filter bed area | m² |
| \(v_b\) | Backwash rate | m/s |
| \(t_b\) | Backwash duration | s |
| \(v_f\) | Filtration rate | m/s |
| \(t_r\) | Filter run between washes | s |
| \(\dot V_b\) | Backwash flow | m³/s |
| \(V_b\) | Water per wash | m³ |
| \(V_f\) | Water filtered per run | m³ |
| \(x\) | Share of filtered water used for washing | - |
Method and standards
Volume balance.
Where it is used
- Pre-treatment filters for DM and RO plants.
- Backwash pump and tank sizing.
Common mistakes
- Rate in m/h used as m/s.
- Ignoring rinse.
Assumptions and limits
- One filter washed at a time.
- The share uses the gross filtrate of a run; the filter is off line during the wash and that lost output is not deducted (negligible for long runs).
References
- Q_b = A v_b; V_b = Q_b t_b; filtered = A v_f t_r
Questions and answers
30 m² at 40 m/h for 10 min?
1200 m³/h backwash, 200 m³ per wash; 2.8 % of a day's filtrate.
Backwash tank?
Hold at least one wash, plus margin.
Cold water?
Higher viscosity expands the bed more: lower the rate.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.