Worked example
Example: Six 4-hour blocks. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Block 1: inflow | 40.000 m³/h |
| Block 2: inflow | 60.000 m³/h |
| Block 3: inflow | 120.00 m³/h |
| Block 4: inflow | 140.00 m³/h |
| Block 5: inflow | 90.000 m³/h |
| Block 6: inflow | 50.000 m³/h |
| Length of each block | 4.0000 h |
| Allowance for dead volume and margin | 20.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Average outflow | 83.333 m³/h |
| Storage needed | 400.00 m³ |
| Tank volume with allowance | 480.00 m³ |
Open this example in the calculator and change any input.
Formula
\(V_s = \max_k \sum_{i \le k}(Q_i - \bar Q)t_b - \min_k \sum_{i \le k}(Q_i - \bar Q)t_b\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_{1}\) | Block 1: inflow | m³/s |
| \(Q_{2}\) | Block 2: inflow | m³/s |
| \(Q_{3}\) | Block 3: inflow | m³/s |
| \(Q_{4}\) | Block 4: inflow | m³/s |
| \(Q_{5}\) | Block 5: inflow | m³/s |
| \(Q_{6}\) | Block 6: inflow | m³/s |
| \(t_b\) | Length of each block | s |
| \(k\) | Allowance for dead volume and margin | - |
| \(\bar Q\) | Average outflow | m³/s |
| \(V_s\) | Storage needed | m³ |
| \(V\) | Tank volume with allowance | m³ |
Method and standards
Mass diagram.
Where it is used
- ETP equalisation tanks.
- Condensate and drain collection tanks.
Common mistakes
- Averaging over a non-repeating period.
- No dead volume.
Assumptions and limits
- The six-block pattern (6 t_b long) repeats; with 4-hour blocks that is a daily pattern, with other block lengths the cycle is 6 t_b.
References
- Mass-diagram method: storage = max − min of cumulative (inflow − average) (Metcalf & Eddy)
Questions and answers
Six 4-hour blocks of 40, 60, 120, 140, 90 and 50 m³/h?
Average 83.3 m³/h; storage 400 m³, about 480 m³ with 20 % allowance.
Why the cumulative curve?
The tank fills while inflow exceeds the average and drains when it is below.
Load equalisation?
Concentration peaks also flatten when the tank is mixed.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.