Rainwater Recharge Pit: Runoff Volume and Pit Size

Runoff volume from a roof or paved area for a design storm and the recharge pit volume needed after infiltration during the storm, with the drain-down time.

Refinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 1000 m2 roofPaved yard, sandy soil

From a percolation test at the pit location.

Results

Pit volume is the void volume: divide by the porosity of any gravel fill. Keep a filter before the pit.

Runoff volume42.500m³
Infiltrated during the storm0.36000m³
Pit storage needed42.140m³
Drain-down time after the storm234.11h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1000 m2 roof. The inputs, in the units selected above:

InputValue
Catchment area1,000.0 m²
Runoff coefficient85.000 %
Design storm rainfall depth50.000 mm
Storm duration2.0000 h
Infiltration rate of the soil15.000 mm/h
Infiltrating area of the pit (base and sides)12.000 m²

Applying the formula below gives:

ResultValue
Runoff volume42.500 m³
Infiltrated during the storm0.36000 m³
Pit storage needed42.140 m³
Drain-down time after the storm234.11 h

Open this example in the calculator and change any input.

Formula

\(V_r = C A R, \quad V_p = V_r - k A_b t_s, \quad t_d = \frac{V_p}{k A_b}\)

Variables

Symbol Meaning SI unit
\(A\) Catchment area m²
\(C\) Runoff coefficient -
\(R\) Design storm rainfall depth m
\(t_s\) Storm duration s
\(k\) Infiltration rate of the soil m/s
\(A_b\) Infiltrating area of the pit (base and sides) m²
\(V_r\) Runoff volume m³
\(V_i\) Infiltrated during the storm m³
\(V_p\) Pit storage needed m³
\(t_d\) Drain-down time after the storm s

Method and standards

Water balance.

Where it is used

  • Plant and township rainwater harvesting.
  • Statutory recharge requirements.

Common mistakes

  • Rainfall intensity used as depth.
  • Ignoring clogging.

Assumptions and limits

  • Uniform infiltration; with zero infiltration no drain-down time is shown.

References

  • Runoff V = C A R; storage = runoff − infiltration k A_b t

Questions and answers

1000 m² roof, 50 mm storm in 2 h, soil 15 mm/h, 12 m² pit area?

Runoff 42.5 m³; pit about 42.1 m³, draining in 234 h.

Gravel fill?

Divide by its porosity (about 0.35–0.4) for the pit size.

Clay soils?

Very low infiltration: recharge pits do little there.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.