Worked example
Example: Reuse 2.2 per 100 mL, 90 min. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Coliform before disinfection (per 100 mL) | 1,000,000 - |
| Coliform target (per 100 mL) | 2.2000 - |
| Contact time | 90.000 min |
| Slope n | 2.8000 - |
| Lag (shoulder) CT, mg·min/L | 4.0000 - |
| Immediate chlorine demand | 1.5000 mg/L |
| Decay in the contact tank | 1.0000 mg/L |
Applying the formula below gives:
| Result | Value |
|---|---|
| Required CT | 419.40 |
| Required combined residual | 4.6599 mg/L |
| Chlorine dose | 7.1599 mg/L |
Open this example in the calculator and change any input.
Formula
\(\frac{N}{N_o} = \left(\frac{CT}{b}\right)^{-n}, \quad C = \frac{b}{t}\left(\frac{N}{N_o}\right)^{-1/n}, \quad C_{dose} = C + D_i + D_d\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(N_o\) | Coliform before disinfection (per 100 mL) | - |
| \(N\) | Coliform target (per 100 mL) | - |
| \(t\) | Contact time | s |
| \(n\) | Slope n | - |
| \(b\) | Lag (shoulder) CT, mg·min/L | - |
| \(D_i\) | Immediate chlorine demand | kg/m³ |
| \(D_d\) | Decay in the contact tank | kg/m³ |
| \(CT\) | Required CT | - |
| \(C\) | Required combined residual | kg/m³ |
| \(C_{dose}\) | Chlorine dose | kg/m³ |
Method and standards
Refined Collins-Selleck model.
Where it is used
- Chlorination design for reuse and discharge permits.
- Seasonal dose planning.
Common mistakes
- Using free chlorine coefficients for combined chlorine.
- Leaving out decay in the contact tank.
Assumptions and limits
- Coefficients site-specific; combined chlorine.
Questions and answers
Why is the model different from Chick's law?
Combined chlorine shows a lag (shoulder) before kill starts and a tailing kill rate; the Collins-Selleck power law fits this better for wastewater.
What makes up the dose?
The residual needed for the kill, plus the immediate demand of the effluent, plus what decays in the contact tank over the contact time.
What do the defaults represent?
An illustrative case: Reuse 2.2 per 100 mL, 90 min. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 12-3, eq. 12-27 and Example 12-4