Worked example
Example: Small plant 4,000 m3/d, one tank. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Average flow | 4,000.0 m³/d |
| Peak flow | 10,000 m³/d |
| Overflow rate at average flow | 35.000 m/d |
| Number of tanks | 1.0000 - |
| Tank width | 4.0000 m |
| Side water depth | 3.5000 m |
| Cohesion constant (0.04 sand, 0.06 sticky) | 0.050000 - |
| Particle specific gravity | 1.2000 - |
| Particle diameter | 0.10000 mm |
| Darcy friction factor | 0.030000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Required surface area (all tanks) | 114.29 m² |
| Tank length | 28.571 m |
| Detention at average flow | 2.4000 h |
| Detention at peak flow | 0.96000 h |
| Overflow rate at peak flow | 87.500 m/d |
| Scour velocity | 0.051138 m/s |
| Horizontal velocity at peak flow | 0.008267 m/s |
| BOD removal at average flow | 36.364 % |
| TSS removal at average flow | 58.394 % |
| BOD removal at peak flow | 25.806 % |
| TSS removal at peak flow | 45.845 % |
Open this example in the calculator and change any input.
Formula
\(A = \frac{Q_{avg}}{OR}, \quad t = \frac{Ah}{Q}, \quad v_H = \left[\frac{8k(s - 1)gd}{f}\right]^{1/2}, \quad R = \frac{t}{a + bt}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_{avg}\) | Average flow | m³/s |
| \(Q_{peak}\) | Peak flow | m³/s |
| \(OR\) | Overflow rate at average flow | m/s |
| \(n\) | Number of tanks | - |
| \(W\) | Tank width | m |
| \(h\) | Side water depth | m |
| \(k\) | Cohesion constant (0.04 sand, 0.06 sticky) | - |
| \(s\) | Particle specific gravity | - |
| \(d\) | Particle diameter | m |
| \(f\) | Darcy friction factor | - |
| \(A\) | Required surface area (all tanks) | m² |
| \(L\) | Tank length | m |
| \(t_{avg}\) | Detention at average flow | s |
| \(t_{peak}\) | Detention at peak flow | s |
| \(OR_p\) | Overflow rate at peak flow | m/s |
| \(v_H\) | Scour velocity | m/s |
| \(v_p\) | Horizontal velocity at peak flow | m/s |
| \(R_{BOD}\) | BOD removal at average flow | - |
| \(R_{TSS}\) | TSS removal at average flow | - |
| \(R_{BOD,p}\) | BOD removal at peak flow | - |
| \(R_{TSS,p}\) | TSS removal at peak flow | - |
Method and standards
Primary sedimentation design.
Where it is used
- Primary clarifier sizing.
- Estimating loads to secondary treatment.
Common mistakes
- Entering the detention time in minutes in t/(a + bt), whose constants are for hours.
- Using one tank's width with the total area.
Assumptions and limits
- Empirical removal curves at 20 °C for typical municipal wastewater.
Questions and answers
What does the scour check tell me?
If the horizontal velocity along the tank approached Camp's scour velocity, settled sludge would be picked up again; it is normally an order of magnitude lower.
What do the defaults represent?
An illustrative case: Small plant 4,000 m3/d, one tank. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 5-6, eqs. 5-45 and 5-46 and Example 5-9 (Crites and Tchobanoglous 1998; Camp 1946)