Worked example
Example: Illustrative 2 m3/day STP sludge. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Wet sludge volume to dry per day | 2.0000 m³/d |
| Drying cycle (fill to removal) | 15.000 d |
| Depth of sludge applied | 250.00 mm |
| Area of one bed | 40.000 m² |
Applying the formula below gives:
| Result | Value |
|---|---|
| Sludge applied per cycle | 30.000 m³ |
| Total bed area | 120.00 m² |
| Number of beds | 3.0000 |
Open this example in the calculator and change any input.
Formula
\(V_c = \dot V_s t_c, \quad A = \frac{V_c}{d}, \quad n = \left\lceil\frac{A}{A_b}\right\rceil\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot V_s\) | Wet sludge volume to dry per day | m³/s |
| \(t_c\) | Drying cycle (fill to removal) | s |
| \(d\) | Depth of sludge applied | m |
| \(A_b\) | Area of one bed | m² |
| \(V_c\) | Sludge applied per cycle | m³ |
| \(A\) | Total bed area | m² |
| \(n\) | Number of beds | - |
Method and standards
Drying beds.
Where it is used
- Small STPs and ETPs.
- Water treatment plant sludge.
Common mistakes
- Ignoring rainy-season cycles.
- Applying sludge too deep.
Assumptions and limits
- Uniform sludge production.
References
- Volume-per-cycle sizing of sludge drying beds
Questions and answers
How much drying bed for 2 m³/day of sludge?
With a 15-day cycle at 25 cm, 120 m², or three 40 m² beds.
Why size on the cycle?
Each bed is out of use for the whole cycle while its sludge dries.
What do the defaults represent?
An illustrative STP producing 2 m³/day of wet sludge, 15-day cycle, 25 cm depth, 40 m² beds.