Worked example
Example: SDI15 test, 40 s and 75 s. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Time for the initial sample (e.g. 500 mL) | 0.66667 min |
| Time for the final sample | 1.2500 min |
| Total test time | 15.000 min |
Applying the formula below gives:
| Result | Value |
|---|---|
| Silt density index | 3.1111 |
| Plugging over the test | 46.667 % |
Open this example in the calculator and change any input.
Formula
\(SDI_T = \frac{100\left(1 - t_i/t_f\right)}{T}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(t_i\) | Time for the initial sample (e.g. 500 mL) | s |
| \(t_f\) | Time for the final sample | s |
| \(T\) | Total test time | s |
| \(SDI_T\) | Silt density index | - |
| \(\%P\) | Plugging over the test | - |
Method and standards
Silt density index.
Where it is used
- RO and NF pretreatment design.
- Monitoring feed water quality.
Common mistakes
- Entering the test time in seconds into the per-minute formula.
- Comparing SDI values from different test times.
Assumptions and limits
- Valid while plugging stays below about 75 %.
Questions and answers
Why is SDI only a guide?
It is a dead-end test at constant pressure through a 0.45 µm filter, while RO runs cross-flow at constant flux and is fouled by smaller colloids too.
What do the defaults represent?
An illustrative case: SDI15 test, 40 s and 75 s. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 11-7, eq. 11-45 and Example 11-7