Worked example
Example: Brackish 1,000 m3/d, 0.03 N, 300 pairs. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Product water flow | 1,000.0 m³/d |
| Feed normality (g-eq/L) | 0.030000 - |
| Salt removal efficiency | 60.000 % |
| Cell pairs in the stack | 300.00 - |
| Current efficiency | 92.000 % |
| Stack resistance | 2.5000 Ω |
| Current density to normality ratio (mA/cm² per g-eq/L) | 600.00 - |
| Product water as a fraction of feed | 85.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Current | 72.830 A |
| Power | 13.261 kW |
| Energy per m³ | 0.37442 kWh/m³ |
| Current density | 180.00 A/m² |
| Membrane area per cell pair | 0.40461 m² |
Open this example in the calculator and change any input.
Formula
\(i = \frac{FQ_pNE_r}{nE_c}, \quad P = Ri^2, \quad CD = (CD/N)\,N, \quad A = \frac{i}{CD}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_p\) | Product water flow | m³/s |
| \(N\) | Feed normality (g-eq/L) | - |
| \(E_r\) | Salt removal efficiency | - |
| \(n\) | Cell pairs in the stack | - |
| \(E_c\) | Current efficiency | - |
| \(R\) | Stack resistance | Ω |
| \(CD/N\) | Current density to normality ratio (mA/cm² per g-eq/L) | - |
| \(y\) | Product water as a fraction of feed | - |
| \(i\) | Current | A |
| \(P\) | Power | W |
| \(e\) | Energy per m³ | J/m³ |
| \(CD\) | Current density | A/m² |
| \(A\) | Membrane area per cell pair | m² |
Method and standards
Faraday's law and Ohm's law for an ED stack.
Where it is used
- Electrodialysis and EDR sizing for reuse.
- Energy comparison with RO.
Common mistakes
- Normality in mg/L.
- Leaving out current efficiency.
Assumptions and limits
- Constant resistance; one stack.
Questions and answers
Why does the current depend on the cell pairs?
Each equivalent of salt moved needs one faraday of charge in each cell pair it passes, but one current passes all pairs in series, so more pairs need less current for the same removal.
Is the energy per m³ of product or feed?
Divides the power by 0.9 × the 4,000 m³/d it uses in the current equation, which is neither the feed (4,000/0.9) nor the product (0.9 × 4,000 if 4,000 is the feed) consistently; the calculator follows its arithmetic, P/(yQ_p). Divide P by the flow you mean for another basis.
What do the defaults represent?
An illustrative case: Brackish 1,000 m3/d, 0.03 N, 300 pairs. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 11-8, eqs. 11-49 and 11-50 and Example 11-9