Worked example
Example: Peak flow 0.9 and 1.0 m/s, 30 % blocked. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Approach velocity in the channel | 0.90000 m/s |
| Velocity through the clean screen openings | 1.0000 m/s |
| Fraction of the open area blocked | 30.000 % |
| Discharge coefficient, clean screen | 0.70000 - |
| Discharge coefficient, clogged screen | 0.60000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Headloss, clean screen | 13.839 mm |
| Velocity through the clogged screen | 1.4286 m/s |
| Headloss, clogged screen | 104.59 mm |
Open this example in the calculator and change any input.
Formula
\(h_L = \frac{1}{C}\,\frac{v_s^2 - v^2}{2g}, \quad v_s' = \frac{v_s}{1 - f_b}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(v\) | Approach velocity in the channel | m/s |
| \(v_s\) | Velocity through the clean screen openings | m/s |
| \(f_b\) | Fraction of the open area blocked | - |
| \(C\) | Discharge coefficient, clean screen | - |
| \(C'\) | Discharge coefficient, clogged screen | - |
| \(h_L\) | Headloss, clean screen | m |
| \(v_s'\) | Velocity through the clogged screen | m/s |
| \(h_L'\) | Headloss, clogged screen | m |
Method and standards
Orifice-type headloss for bar screens.
Where it is used
- Screen channel hydraulic profile.
- Setting rake start levels.
Common mistakes
- Using the channel velocity for both terms.
- Forgetting that blinding raises the through-bar velocity.
Assumptions and limits
- Coarse bar screens; fine screens have much higher losses.
Questions and answers
Why two coefficients?
Designers use about 0.7 for a clean screen and 0.6 once debris has built up, because the flow paths become more irregular.
How do I get the through-bar velocity?
Divide the flow by the clear open area between the bars below the water surface; keep it under about 1 m/s at peak flow so material is not forced through.
What do the defaults represent?
An illustrative case: Peak flow 0.9 and 1.0 m/s, 30 % blocked. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 5-1, eq. 5-1 and Example 5-1