Bar Screen Headloss, Clean and Partly Clogged

Headloss through a coarse bar screen from approach and through-bar velocities with clean and clogged discharge coefficients, and the effect of blinding.

Refinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: Peak flow 0.9 and 1.0 m/s, 30 % blockedLow flow 0.4 and 0.6 m/s, clean

Accepted: 0.05 to 3 m/s
Accepted: 0.05 to 5 m/s
Accepted: 0 to 90 %
Accepted: 0.3 to 1
Accepted: 0.3 to 1

Results

Mechanically cleaned coarse screens are usually limited to about 150 mm of headloss; the rake starts on a differential level or a timer of about 15 min. Blocking half the open area doubles the through-bar velocity and raises the loss about sevenfold.

Headloss, clean screen14.567mm
Velocity through the clogged screen0.60000m/s
Headloss, clogged screen14.567mm

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Peak flow 0.9 and 1.0 m/s, 30 % blocked. The inputs, in the units selected above:

InputValue
Approach velocity in the channel0.90000 m/s
Velocity through the clean screen openings1.0000 m/s
Fraction of the open area blocked30.000 %
Discharge coefficient, clean screen0.70000 -
Discharge coefficient, clogged screen0.60000 -

Applying the formula below gives:

ResultValue
Headloss, clean screen13.839 mm
Velocity through the clogged screen1.4286 m/s
Headloss, clogged screen104.59 mm

Open this example in the calculator and change any input.

Formula

\(h_L = \frac{1}{C}\,\frac{v_s^2 - v^2}{2g}, \quad v_s' = \frac{v_s}{1 - f_b}\)

Variables

Symbol Meaning SI unit
\(v\) Approach velocity in the channel m/s
\(v_s\) Velocity through the clean screen openings m/s
\(f_b\) Fraction of the open area blocked -
\(C\) Discharge coefficient, clean screen -
\(C'\) Discharge coefficient, clogged screen -
\(h_L\) Headloss, clean screen m
\(v_s'\) Velocity through the clogged screen m/s
\(h_L'\) Headloss, clogged screen m

Method and standards

Orifice-type headloss for bar screens.

Where it is used

  • Screen channel hydraulic profile.
  • Setting rake start levels.

Common mistakes

  • Using the channel velocity for both terms.
  • Forgetting that blinding raises the through-bar velocity.

Assumptions and limits

  • Coarse bar screens; fine screens have much higher losses.

Questions and answers

Why two coefficients?

Designers use about 0.7 for a clean screen and 0.6 once debris has built up, because the flow paths become more irregular.

How do I get the through-bar velocity?

Divide the flow by the clear open area between the bars below the water surface; keep it under about 1 m/s at peak flow so material is not forced through.

What do the defaults represent?

An illustrative case: Peak flow 0.9 and 1.0 m/s, 30 % blocked. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Metcalf and Eddy (Tchobanoglous, Stensel, Tsuchihashi and Burton), Wastewater Engineering: Treatment and Resource Recovery, 5th ed. (McGraw-Hill, 2014), sec. 5-1, eq. 5-1 and Example 5-1

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.