FireCADCalc

Domestic Sewage Treatment Plant (STP) Sizing

Sewage flow, BOD load and the volumes and areas of equalisation, aeration and settling tanks for a building or township STP of the extended-aeration type.

Inputs

Examples: Illustrative 1,000-person housingHotel, 300 personsTownship, 10,000

Accepted: 1 to 1,000,000
Accepted: 20 to 500
Accepted: 50 to 100 %
Accepted: 1 to 5
Accepted: 50 to 1,000 mg/L
Accepted: 0 to 24 h
Accepted: 1 to 24 h
Accepted: 0.864 to 86.4 m/d

Results

About 80 % of the water supplied returns as sewage. Peak flows of 2.5–3.5 times average are smoothed in an equalisation tank holding several hours of flow. An extended-aeration tank with 16–24 h detention gives a low sludge yield and stable treatment; the settling tank is sized on the average surface loading (about 12–20 m³/m² per day) and checked at peak. BOD load (flow × concentration) sets the air demand. Confirm with the local discharge standards and the regulator's design norms.

Average sewage flow1,080.0m³/d
Peak flow112.50m³/h
BOD load216.00kg/d
Equalisation tank volume270.00m³
Aeration tank volume720.00m³
Settling tank area60.000m²

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 1,000-person housing. The inputs, in the units selected above:

InputValue
Population served1,000.0 -
Water supply per person per day (litres)135.00 -
Share of water returned as sewage80.000 %
Peak factor3.0000 -
Raw sewage BOD250.00 mg/L
Equalisation storage8.0000 h
Aeration tank detention time18.000 h
Settling tank surface loading15.000 m/d

Applying the formula below gives:

ResultValue
Average sewage flow108.00 m³/d
Peak flow13.500 m³/h
BOD load27.000 kg/d
Equalisation tank volume36.000 m³
Aeration tank volume81.000 m³
Settling tank area7.2000 m²

Open this example in the calculator and change any input.

Formula

\(Q = N q f_s, \quad V_{eq} = Q t_{eq}, \quad V_a = Q t_a, \quad A_s = \frac{Q}{v_o}\)

Variables

Symbol Meaning SI unit
\(N\) Population served -
\(q\) Water supply per person per day (litres) -
\(f_s\) Share of water returned as sewage -
\(k_p\) Peak factor -
\(BOD\) Raw sewage BOD kg/m³
\(t_{eq}\) Equalisation storage s
\(t_a\) Aeration tank detention time s
\(v_o\) Settling tank surface loading m/s
\(Q\) Average sewage flow m³/s
\(Q_p\) Peak flow m³/s
\(L_{BOD}\) BOD load kg/s
\(V_{eq}\) Equalisation tank volume m³
\(V_a\) Aeration tank volume m³
\(A_s\) Settling tank area m²

Method and standards

STP sizing.

Where it is used

  • Apartments, hotels, hospitals and townships.
  • Checking package STP offers.

Common mistakes

  • Sizing tanks on peak flow throughout.
  • Ignoring equalisation for intermittent flows.

Assumptions and limits

  • Extended-aeration process; steady average flow.

References

  • Flow
  • load and detention-time sizing of a package STP

Questions and answers

What size STP does a 1,000-person apartment need?

About 108 m³/day (108 KLD) of sewage at 135 L/head and 80 % return.

What is KLD?

Kilolitres per day, the same as cubic metres per day.

What do the defaults represent?

An illustrative 1,000-person housing project with 135 L/head, 80 % to sewer, peak factor 3, 250 mg/L BOD, 8 h equalisation, 18 h aeration and 15 m/d settling.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.