Worked example
Example: Illustrative 1,000-person housing. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Population served | 1,000.0 - |
| Water supply per person per day (litres) | 135.00 - |
| Share of water returned as sewage | 80.000 % |
| Peak factor | 3.0000 - |
| Raw sewage BOD | 250.00 mg/L |
| Equalisation storage | 8.0000 h |
| Aeration tank detention time | 18.000 h |
| Settling tank surface loading | 15.000 m/d |
Applying the formula below gives:
| Result | Value |
|---|---|
| Average sewage flow | 108.00 m³/d |
| Peak flow | 13.500 m³/h |
| BOD load | 27.000 kg/d |
| Equalisation tank volume | 36.000 m³ |
| Aeration tank volume | 81.000 m³ |
| Settling tank area | 7.2000 m² |
Open this example in the calculator and change any input.
Formula
\(Q = N q f_s, \quad V_{eq} = Q t_{eq}, \quad V_a = Q t_a, \quad A_s = \frac{Q}{v_o}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(N\) | Population served | - |
| \(q\) | Water supply per person per day (litres) | - |
| \(f_s\) | Share of water returned as sewage | - |
| \(k_p\) | Peak factor | - |
| \(BOD\) | Raw sewage BOD | kg/m³ |
| \(t_{eq}\) | Equalisation storage | s |
| \(t_a\) | Aeration tank detention time | s |
| \(v_o\) | Settling tank surface loading | m/s |
| \(Q\) | Average sewage flow | m³/s |
| \(Q_p\) | Peak flow | m³/s |
| \(L_{BOD}\) | BOD load | kg/s |
| \(V_{eq}\) | Equalisation tank volume | m³ |
| \(V_a\) | Aeration tank volume | m³ |
| \(A_s\) | Settling tank area | m² |
Method and standards
STP sizing.
Where it is used
- Apartments, hotels, hospitals and townships.
- Checking package STP offers.
Common mistakes
- Sizing tanks on peak flow throughout.
- Ignoring equalisation for intermittent flows.
Assumptions and limits
- Extended-aeration process; steady average flow.
References
- Flow
- load and detention-time sizing of a package STP
Questions and answers
What size STP does a 1,000-person apartment need?
About 108 m³/day (108 KLD) of sewage at 135 L/head and 80 % return.
What is KLD?
Kilolitres per day, the same as cubic metres per day.
What do the defaults represent?
An illustrative 1,000-person housing project with 135 L/head, 80 % to sewer, peak factor 3, 250 mg/L BOD, 8 h equalisation, 18 h aeration and 15 m/d settling.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.