Worked example
Example: M20, As 245 mm², proof 600 MPa, 75 %, K 0.2. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Nominal bolt diameter | 20.000 mm |
| Tensile stress area | 245.00 mm² |
| Proof strength of the bolt | 600.00 MPa |
| Preload as a share of proof load | 75.000 % |
| Nut factor | 0.20000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Tightening torque | 441.00 N·m |
| Bolt preload | 110.25 kN |
| Proof load | 147.00 kN |
| Tensile stress at preload | 450.00 MPa |
Open this example in the calculator and change any input.
Formula
\(F_p = S_p\,A_s \qquad F_i = x\,F_p \qquad T = K\,F_i\,d \qquad \sigma_i = x\,S_p\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(d\) | nominal diameter | m |
| \(A_s\) | tensile stress area | m² |
| \(S_p\) | proof strength | Pa |
| \(x\) | preload share of proof load | – |
| \(K\) | nut factor | – |
| \(T\) | tightening torque | N·m |
| \(F_i\) | preload | N |
| \(F_p\) | proof load | N |
| \(\sigma_i\) | stress at preload | Pa |
Method and standards
Short-form torque–tension relation with an empirical nut factor.
Where it is used
- Flange and pressure-part bolting.
- Structural and machine joints.
- Maintenance torque charts.
Common mistakes
- Using a nut factor for dry threads on lubricated bolts.
- Using nominal area instead of stress area.
- Expecting better than ±25 % preload from torque.
Assumptions and limits
- Nut factor scatter dominates; for critical joints use tension control.
- The combined (tension plus thread torsion) stress during tightening is not checked; a preload above 90 % of proof load is flagged.
References
- Short-form torque equation T = K F d
Questions and answers
What torque for an M20 bolt with 600 MPa proof strength at 75 % preload?
Preload 110 kN; torque 441 N·m with K = 0.2.
Why does lubrication matter so much?
Most torque goes into friction; lowering K from 0.2 to 0.15 gives a third more preload at the same torque.
Where do I get the stress area?
From the thread standard's table for the size and pitch.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.