Worked example
Example: Illustrative 25 m2 sunny room. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Floor area | 25.000 m² |
| Fabric and solar load per m² of floor | 0.10000 kW/m² |
| Occupants | 3.0000 - |
| Sensible heat per person | 0.075000 kW |
| Latent heat per person | 0.055000 kW |
| Lighting per m² | 0.008000 kW/m² |
| Equipment heat | 0.40000 kW |
| Safety factor | 1.1000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Sensible load | 3.3250 kW |
| Latent load | 0.16500 kW |
| Cooling capacity to select | 3.8390 kW |
| Capacity in tons of refrigeration | 1.0916 TR |
| Capacity in BTU/h | 13,099 Btu/h |
Open this example in the calculator and change any input.
Formula
\(Q = k\left[A(q_A + q_{lt}) + N(q_s + q_l) + Q_{eq}\right]\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Floor area | m² |
| \(q_A\) | Fabric and solar load per m² of floor | W/m² |
| \(N\) | Occupants | - |
| \(q_s\) | Sensible heat per person | W |
| \(q_l\) | Latent heat per person | W |
| \(q_{lt}\) | Lighting per m² | W/m² |
| \(Q_{eq}\) | Equipment heat | W |
| \(k\) | Safety factor | - |
| \(Q_s\) | Sensible load | W |
| \(Q_l\) | Latent load | W |
| \(Q\) | Cooling capacity to select | W |
Method and standards
Quick sizing.
Where it is used
- Room and small-office split units.
- Sanity checks of quotations.
Common mistakes
- Ignoring people and equipment.
- Oversizing heavily, which harms dehumidification.
Assumptions and limits
- Rule-of-thumb loads; single room.
References
- Room cooling load by unit-area allowance
- ASHRAE Handbook of Fundamentals (ASHRAE)
Questions and answers
How many tons for a 25 m² room?
About 1 ton (3.5 kW) for a sunny room with a few people by these allowances; shaded rooms need less.
Why not just use W/m²?
People and equipment can double the load in small offices or kitchens; add them separately.
What do the defaults represent?
An illustrative 25 m² room with 100 W/m² fabric and sun load, three people, 8 W/m² lighting and 400 W of equipment, safety factor 1.1.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.