Absorber Minimum Liquid Rate

Minimum liquid-to-gas ratio of a counter-current absorber where the leaving liquid would be in equilibrium with the entering gas, and the design liquid rate.

Sugar mill and cogenerationRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Clean solventLean solvent

Results

Dilute system with a straight equilibrium line; a curved line can pinch in the middle of the column.

Minimum liquid-to-gas ratio2.0000
Design ratio2.6000
Liquid molar flow130.00kmol/h
Solute in the leaving liquid1.9692%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Clean solvent. The inputs, in the units selected above:

InputValue
Solute in the gas entering2.0000 %
Solute in the gas leaving0.10000 %
Solute in the liquid entering0 %
Equilibrium slope y = mx1.2000 -
Design multiple of the minimum1.5000 -
Gas molar flow100.00 kmol/h

Applying the formula below gives:

ResultValue
Minimum liquid-to-gas ratio1.1400
Design ratio1.7100
Liquid molar flow171.00 kmol/h
Solute in the leaving liquid1.1111 %

Open this example in the calculator and change any input.

Formula

\(\left(\frac{L}{G}\right)_{min} = \frac{y_1 - y_2}{y_1/m - x_2}\)

Variables

Symbol Meaning SI unit
\(y_1\) Solute in the gas entering -
\(y_2\) Solute in the gas leaving -
\(x_2\) Solute in the liquid entering -
\(m\) Equilibrium slope y = mx -
\(f\) Design multiple of the minimum -
\(G\) Gas molar flow mol/s
\((L/G)_{min}\) Minimum liquid-to-gas ratio -
\(L/G\) Design ratio -
\(L\) Liquid molar flow mol/s
\(x_1\) Solute in the leaving liquid -

Method and standards

Mass balance at the pinch.

Where it is used

  • Scrubber and absorber design.
  • Checking existing columns.

Common mistakes

  • Mass ratios.
  • Curved equilibrium.

Assumptions and limits

  • Dilute, straight equilibrium line.
  • Mole fractions and total flows stand in for the exact solute-free ratios (Y = y/(1 − y), X, carrier flows G_s, L_s); the error grows with y₁, and the page warns above 10 % solute.

References

  • Operating line through (x₂, y₂) touching equilibrium at the gas inlet: (L/G)_min = (y₁ − y₂)/(y₁/m − x₂)

Questions and answers

2 % to 0.1 %, m 1.2, clean solvent?

(L/G)_min 1.140; at 1.5 × that is 1.71.

Why 1.2–2 × minimum?

At the minimum the column would need infinite height.

Solvent cost?

Higher L/G means fewer stages but more pumping and regeneration.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.