FireCADCalc

Multiple-Barrier Treatment: Pathogen Removal Reliability

Days per year at each overall log removal for a train of identical treatment barriers that fail at random, against one barrier giving the same normal removal.

Inputs

Examples: Illustrative: three 2-log barriers, each failed 2 % of the time at half removal, 5 log requiredFour 1.5-log barriers, 5 % failure, a quarter of removal when failed, 4 log required

Accepted: 1 to 6
Accepted: 0.1 to 10
Accepted: 0 to 50 %
Accepted: 0 to 100 %
Accepted: 0.1 to 20

Results

Barriers fail independently and at random; a failed barrier achieves the stated share of its normal removal. The comparison is a single barrier with the whole normal removal and the same failure behaviour.

Overall removal with every barrier working6.0000
Days a year with no barrier failed297.29d
Days a year with exactly one barrier failed62.588d
Days a year with two or more failed5.1168d
Removal with every barrier failed1.5000
Expected overall removal5.7750
Days a year below the required removal122.80h
Same for one barrier giving the whole normal removal438.00h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative: three 2-log barriers, each failed 2 % of the time at half removal, 5 log required. The inputs, in the units selected above:

InputValue
Number of barriers in series3.0000 -
Log removal of each barrier when working2.0000 -
Share of time each barrier is in failure mode2.0000 %
Share of normal removal achieved when failed50.000 %
Required overall log removal5.0000 -

Applying the formula below gives:

ResultValue
Overall removal with every barrier working6.0000
Days a year with no barrier failed343.54 d
Days a year with exactly one barrier failed21.033 d
Days a year with two or more failed0.43216 d
Removal with every barrier failed3.0000
Expected overall removal5.9400
Days a year below the required removal10.372 h
Same for one barrier giving the whole normal removal175.20 h

Open this example in the calculator and change any input.

Formula

\(P(k) = \binom{n}{k}p^k(1 - p)^{n - k}, \quad LR_k = (n - k)LR + k\,\phi\,LR\)

\(t_{<target} = 365\,\text{d}\sum_{LR_k < LR_{target}}P(k)\)

Variables

Symbol Meaning SI unit
\(n\) Number of barriers in series -
\(LR\) Log removal of each barrier when working -
\(p\) Share of time each barrier is in failure mode -
\(\phi\) Share of normal removal achieved when failed -
\(LR_{target}\) Required overall log removal -
\(LR_{normal}\) Overall removal with every barrier working -
\(t_0\) Days a year with no barrier failed s
\(t_1\) Days a year with exactly one barrier failed s
\(t_{\ge 2}\) Days a year with two or more failed s
\(LR_{min}\) Removal with every barrier failed -
\(\overline{LR}\) Expected overall removal -
\(t_{<target}\) Days a year below the required removal s
\(t_{<target,1}\) Same for one barrier giving the whole normal removal s

Method and standards

Binomial model of independent barrier failures with partial removal when failed.

Where it is used

  • Explaining the multiple-barrier principle.
  • Comparing treatment train options.

Common mistakes

  • Adding log removals of barriers that are not independent.
  • Ignoring partial performance in failure.

Assumptions and limits

  • Identical barriers; independent failures; steady removal values.

References

  • Independent random failures of identical barriers (binomial distribution)

Questions and answers

Why are several barriers better than one with the same removal?

A single failure costs the whole train only a part of its removal, and simultaneous failures are rare; a single barrier that fails loses half the total at once.

Are failures really independent?

Not always: a storm or power cut can upset several processes together, so treat the result as a best case.

What do the defaults represent?

An illustrative train of three barriers of 2 log each, each failed 2 % of the time and then giving half its removal, against a 5 log requirement.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Crittenden et al., MWH's Water Treatment: Principles and Design, 3rd ed. (Wiley, 2012), sec. 4-6, Example 4-1

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.