Worked example
Example: Illustrative: three 2-log barriers, each failed 2 % of the time at half removal, 5 log required. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Number of barriers in series | 3.0000 - |
| Log removal of each barrier when working | 2.0000 - |
| Share of time each barrier is in failure mode | 2.0000 % |
| Share of normal removal achieved when failed | 50.000 % |
| Required overall log removal | 5.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Overall removal with every barrier working | 6.0000 |
| Days a year with no barrier failed | 343.54 d |
| Days a year with exactly one barrier failed | 21.033 d |
| Days a year with two or more failed | 0.43216 d |
| Removal with every barrier failed | 3.0000 |
| Expected overall removal | 5.9400 |
| Days a year below the required removal | 10.372 h |
| Same for one barrier giving the whole normal removal | 175.20 h |
Open this example in the calculator and change any input.
Formula
\(P(k) = \binom{n}{k}p^k(1 - p)^{n - k}, \quad LR_k = (n - k)LR + k\,\phi\,LR\)
\(t_{<target} = 365\,\text{d}\sum_{LR_k < LR_{target}}P(k)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(n\) | Number of barriers in series | - |
| \(LR\) | Log removal of each barrier when working | - |
| \(p\) | Share of time each barrier is in failure mode | - |
| \(\phi\) | Share of normal removal achieved when failed | - |
| \(LR_{target}\) | Required overall log removal | - |
| \(LR_{normal}\) | Overall removal with every barrier working | - |
| \(t_0\) | Days a year with no barrier failed | s |
| \(t_1\) | Days a year with exactly one barrier failed | s |
| \(t_{\ge 2}\) | Days a year with two or more failed | s |
| \(LR_{min}\) | Removal with every barrier failed | - |
| \(\overline{LR}\) | Expected overall removal | - |
| \(t_{<target}\) | Days a year below the required removal | s |
| \(t_{<target,1}\) | Same for one barrier giving the whole normal removal | s |
Method and standards
Binomial model of independent barrier failures with partial removal when failed.
Where it is used
- Explaining the multiple-barrier principle.
- Comparing treatment train options.
Common mistakes
- Adding log removals of barriers that are not independent.
- Ignoring partial performance in failure.
Assumptions and limits
- Identical barriers; independent failures; steady removal values.
References
- Independent random failures of identical barriers (binomial distribution)
Questions and answers
Why are several barriers better than one with the same removal?
A single failure costs the whole train only a part of its removal, and simultaneous failures are rare; a single barrier that fails loses half the total at once.
Are failures really independent?
Not always: a storm or power cut can upset several processes together, so treat the result as a best case.
What do the defaults represent?
An illustrative train of three barriers of 2 log each, each failed 2 % of the time and then giving half its removal, against a 5 log requirement.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Crittenden et al., MWH's Water Treatment: Principles and Design, 3rd ed. (Wiley, 2012), sec. 4-6, Example 4-1