Worked example
Example: Cold-water design 20,000 m3/d at 45 LMH, 30 + 1.5 min, 80 L, 38 m2, CIP 6 h every 21 d. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Net permeate production | 20,000 m³/d |
| Design flux at the design temperature | 45.000 L/(m²·h) |
| Filtration time per cycle | 30.000 min |
| Backwash time per cycle | 1.5000 min |
| Backwash volume per module | 80.000 L |
| Membrane area per module | 38.000 m² |
| Integrity test time per day | 15.000 min |
| Duration of one clean-in-place | 6.0000 h |
| Days between cleanings | 21.000 - |
| Maximum modules per rack | 80.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Online production factor | 93.006 % |
| System recovery | 90.643 % |
| Feed flow | 22,065 m³/d |
| Membrane area required | 21,966 m² |
| Modules required | 579.00 |
| Racks | 8.0000 |
| Modules per rack (equal racks) | 73.000 |
Open this example in the calculator and change any input.
Formula
\(\eta = \frac{1440 - t_{bw} - t_{dit} - t_{cip}}{1440}, \quad r = \frac{Jat_f - V_{bw}}{Jat_f}\)
\(Q_f = \frac{Q_p}{r}, \quad A = \frac{Q_f}{J\eta}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_p\) | Net permeate production | m³/s |
| \(J\) | Design flux at the design temperature | m/s |
| \(t_f\) | Filtration time per cycle | s |
| \(t_{bw}\) | Backwash time per cycle | s |
| \(V_{bw}\) | Backwash volume per module | m³ |
| \(a_m\) | Membrane area per module | m² |
| \(t_{dit}\) | Integrity test time per day | s |
| \(t_{cip}\) | Duration of one clean-in-place | s |
| \(t_{int}\) | Days between cleanings | - |
| \(n_{rack}\) | Maximum modules per rack | - |
| \(\eta\) | Online production factor | - |
| \(r\) | System recovery | - |
| \(Q_f\) | Feed flow | m³/s |
| \(A\) | Membrane area required | m² |
| \(N_{mod}\) | Modules required | - |
| \(N_{rack}\) | Racks | - |
| \(n\) | Modules per rack (equal racks) | - |
Method and standards
Time-averaged production and recovery of a backwashed membrane system.
Where it is used
- Preliminary sizing of UF and MF plants.
- Checking vendor proposals.
Common mistakes
- Designing at the warm-water flux.
- Forgetting the integrity test and cleaning downtime.
Assumptions and limits
- Constant flux operation; backwash with permeate.
Questions and answers
Why does recovery use the module backwash volume?
Every module loses its own backwash water each cycle, so recovery is the same for one module as for the plant.
What sets the design flux?
Pilot testing at the coldest expected water; typical low-pressure membrane fluxes are 40–100 L/(m²·h).
What do the defaults represent?
An illustrative case: Cold-water design 20,000 m3/d at 45 LMH, 30 + 1.5 min, 80 L, 38 m2, CIP 6 h every 21 d. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Crittenden et al., MWH's Water Treatment: Principles and Design, 3rd ed. (Wiley, 2012), sec. 12-7, eq. 12-26 and Example 12-8