FireCADCalc

Snyder's Synthetic Unit Hydrograph

Basin lag, standard rainfall duration and peak of a 1 cm unit hydrograph for an ungauged catchment by Snyder's method, from area, stream lengths and coefficients.

Inputs

Examples: Illustrative 1,500 km2 catchmentSteep 200 km2 catchmentFlat 5,000 km2 basin

Accepted: 1 to 100,000 km²
Accepted: 0.1 to 1,000 km
Accepted: 0.1 to 1,000 km
Accepted: 0.3 to 3
Accepted: 0.3 to 1

Results

Snyder related the basin lag (centroid of effective rain to peak) to catchment shape: t_p = 0.75C_t(L·L_ca)^0.3 hours with lengths in km. The standard unit hydrograph duration is t_p/5.5, and its peak for 1 cm of runoff is Q_p = 2.78C_pA/t_p (m³/s, A in km²). The coefficients (C_t about 1.35–1.65 in steep areas to 2 or more in flat ones; C_p 0.56–0.69) come from gauged catchments in the same region. Widths and base time then shape the hydrograph.

Basin lag5.8120h
Standard rainfall duration1.0567h
Peak of the 1 cm unit hydrograph62.182m³/s
Time from start of rain to peak6.3404h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 1,500 km2 catchment. The inputs, in the units selected above:

InputValue
Catchment area1,500.0 km²
Main stream length to the divide80.000 km
Stream length to the point nearest the centroid40.000 km
Lag coefficient1.8000 -
Peak coefficient0.60000 -

Applying the formula below gives:

ResultValue
Basin lag15.201 h
Standard rainfall duration2.7639 h
Peak of the 1 cm unit hydrograph164.59 m³/s
Time from start of rain to peak16.583 h

Open this example in the calculator and change any input.

Formula

\(t_p = 0.75C_t(LL_{ca})^{0.3}, \quad t_r = \frac{t_p}{5.5}, \quad Q_p = \frac{2.78C_pA}{t_p}\)

Variables

Symbol Meaning SI unit
\(A\) Catchment area m²
\(L\) Main stream length to the divide m
\(L_{ca}\) Stream length to the point nearest the centroid m
\(C_t\) Lag coefficient -
\(C_p\) Peak coefficient -
\(t_p\) Basin lag s
\(t_r\) Standard rainfall duration s
\(Q_p\) Peak of the 1 cm unit hydrograph m³/s
\(T_p\) Time from start of rain to peak s

Method and standards

Snyder UH.

Where it is used

  • Flood estimation for ungauged catchments.
  • Civil engineering examinations.

Common mistakes

  • Using coefficients from a different region.
  • Mixing km and miles in the lag formula.

Assumptions and limits

  • SI form; 1 cm effective rainfall.

References

  • Classical engineering hydrology relations

Questions and answers

What is the unit hydrograph peak for a 1,500 km² catchment with L = 80 km, L_ca = 40 km?

Basin lag about 15.2 h and a peak of about 165 m³/s per cm of runoff.

Where do C_t and C_p come from?

From unit hydrographs of gauged catchments in the same region.

What do the defaults represent?

An illustrative 1,500 km² catchment, 80 km main stream, 40 km to the centroid, C_t 1.8 and C_p 0.6.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Snyder, Synthetic unit-graphs, Transactions of the American Geophysical Union 19 (1938)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.