Worked example
Example: 500 m² roof, monsoon pattern, 30 m³/month. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Catchment (roof) area | 500.00 m² |
| Runoff coefficient | 85.000 % |
| Demand per month | 30.000 m³ |
| Rainfall, January | 5.0000 mm |
| Rainfall, February | 5.0000 mm |
| Rainfall, March | 5.0000 mm |
| Rainfall, April | 10.000 mm |
| Rainfall, May | 30.000 mm |
| Rainfall, June | 150.00 mm |
| Rainfall, July | 250.00 mm |
| Rainfall, August | 220.00 mm |
| Rainfall, September | 150.00 mm |
| Rainfall, October | 60.000 mm |
| Rainfall, November | 15.000 mm |
| Rainfall, December | 5.0000 mm |
Applying the formula below gives:
| Result | Value |
|---|---|
| Water harvested per year | 384.62 m³ |
| Demand per year | 360.00 m³ |
| Storage needed for full supply | 182.62 m³ |
| Supply-to-demand ratio | 106.84 % |
Open this example in the calculator and change any input.
Formula
\(V_t = \sum_iP_iAC, \quad S = \max_t\sum(D - V)^+\ \text{(sequent peak)}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Catchment (roof) area | m² |
| \(C\) | Runoff coefficient | - |
| \(D\) | Demand per month | m³ |
| \(P_{1}\) | Rainfall, January | m |
| \(P_{2}\) | Rainfall, February | m |
| \(P_{3}\) | Rainfall, March | m |
| \(P_{4}\) | Rainfall, April | m |
| \(P_{5}\) | Rainfall, May | m |
| \(P_{6}\) | Rainfall, June | m |
| \(P_{7}\) | Rainfall, July | m |
| \(P_{8}\) | Rainfall, August | m |
| \(P_{9}\) | Rainfall, September | m |
| \(P_{10}\) | Rainfall, October | m |
| \(P_{11}\) | Rainfall, November | m |
| \(P_{12}\) | Rainfall, December | m |
| \(V_y\) | Water harvested per year | m³ |
| \(D_y\) | Demand per year | m³ |
| \(S\) | Storage needed for full supply | m³ |
| \(V_y/D_y\) | Supply-to-demand ratio | - |
Method and standards
Monthly mass balance.
Where it is used
- Plant roof harvesting.
- Township water supply.
Common mistakes
- Using average-year rainfall.
- Ignoring first-flush diversion.
Assumptions and limits
- Constant demand; repeating year.
References
- Monthly mass balance with the sequent-peak algorithm (Thomas and Fiering; Subramanya, Engineering Hydrology, ch. 9)
Questions and answers
Why does monsoon India need large tanks?
Most rain falls in four months; the tank must carry water through the eight dry months.
What runoff coefficient should I use?
0.8–0.9 for metal or concrete roofs, 0.6–0.7 for tiles, lower for paved ground.
What do the defaults represent?
A 500 m² roof with a monsoon rainfall pattern and 30 m³ demand per month.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.