Rainwater Harvesting Tank Size by a Monthly Balance

Yearly rainwater harvested from a roof and the tank needed to meet a constant monthly demand, by a monthly sequent-peak mass balance.

Thermal power plantProcess steam and utilitiesSugar mill and cogeneration

Inputs

Examples: 500 m² roof, monsoon pattern, 30 m³/monthFactory roof 4,000 m², 220 m³/month

Results

Monthly balance; first-flush losses and evaporation are not modelled. Use rainfall of a dry year, not the average, for a reliable supply.

Water harvested per year384.62m³
Demand per year360.00m³
Storage needed for full supply182.62m³
Supply-to-demand ratio106.84%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 500 m² roof, monsoon pattern, 30 m³/month. The inputs, in the units selected above:

InputValue
Catchment (roof) area500.00 m²
Runoff coefficient85.000 %
Demand per month30.000 m³
Rainfall, January5.0000 mm
Rainfall, February5.0000 mm
Rainfall, March5.0000 mm
Rainfall, April10.000 mm
Rainfall, May30.000 mm
Rainfall, June150.00 mm
Rainfall, July250.00 mm
Rainfall, August220.00 mm
Rainfall, September150.00 mm
Rainfall, October60.000 mm
Rainfall, November15.000 mm
Rainfall, December5.0000 mm

Applying the formula below gives:

ResultValue
Water harvested per year384.62 m³
Demand per year360.00 m³
Storage needed for full supply182.62 m³
Supply-to-demand ratio106.84 %

Open this example in the calculator and change any input.

Formula

\(V_t = \sum_iP_iAC, \quad S = \max_t\sum(D - V)^+\ \text{(sequent peak)}\)

Variables

Symbol Meaning SI unit
\(A\) Catchment (roof) area m²
\(C\) Runoff coefficient -
\(D\) Demand per month m³
\(P_{1}\) Rainfall, January m
\(P_{2}\) Rainfall, February m
\(P_{3}\) Rainfall, March m
\(P_{4}\) Rainfall, April m
\(P_{5}\) Rainfall, May m
\(P_{6}\) Rainfall, June m
\(P_{7}\) Rainfall, July m
\(P_{8}\) Rainfall, August m
\(P_{9}\) Rainfall, September m
\(P_{10}\) Rainfall, October m
\(P_{11}\) Rainfall, November m
\(P_{12}\) Rainfall, December m
\(V_y\) Water harvested per year m³
\(D_y\) Demand per year m³
\(S\) Storage needed for full supply m³
\(V_y/D_y\) Supply-to-demand ratio -

Method and standards

Monthly mass balance.

Where it is used

  • Plant roof harvesting.
  • Township water supply.

Common mistakes

  • Using average-year rainfall.
  • Ignoring first-flush diversion.

Assumptions and limits

  • Constant demand; repeating year.

References

  • Monthly mass balance with the sequent-peak algorithm (Thomas and Fiering; Subramanya, Engineering Hydrology, ch. 9)

Questions and answers

Why does monsoon India need large tanks?

Most rain falls in four months; the tank must carry water through the eight dry months.

What runoff coefficient should I use?

0.8–0.9 for metal or concrete roofs, 0.6–0.7 for tiles, lower for paved ground.

What do the defaults represent?

A 500 m² roof with a monsoon rainfall pattern and 30 m³ demand per month.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.