Worked example
Example: Illustrative five stations, 10 % error. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Rainfall, station 1 | 820.00 mm |
| Rainfall, station 2 | 650.00 mm |
| Rainfall, station 3 | 720.00 mm |
| Rainfall, station 4 (0 = none) | 900.00 mm |
| Rainfall, station 5 (0 = none) | 1,020.0 mm |
| Rainfall, station 6 (0 = none) | 0 mm |
| Allowable error in mean rainfall | 10.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Mean rainfall | 822.00 mm |
| Coefficient of variation | 17.763 % |
| Optimum number of gauges | 4.0000 |
| Additional gauges | 0 |
Open this example in the calculator and change any input.
Formula
\(C_v = \frac{\sigma_{n-1}}{\bar P}, \quad N = \left(\frac{C_v}{\varepsilon}\right)^2\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P_1\) | Rainfall, station 1 | m |
| \(P_2\) | Rainfall, station 2 | m |
| \(P_3\) | Rainfall, station 3 | m |
| \(P_4\) | Rainfall, station 4 (0 = none) | m |
| \(P_5\) | Rainfall, station 5 (0 = none) | m |
| \(P_6\) | Rainfall, station 6 (0 = none) | m |
| \(\varepsilon\) | Allowable error in mean rainfall | - |
| \(\bar P\) | Mean rainfall | m |
| \(C_v\) | Coefficient of variation | - |
| \(N\) | Optimum number of gauges | - |
| \(N - n\) | Additional gauges | - |
Method and standards
Rain gauge network.
Where it is used
- Catchment hydrology studies.
- Civil engineering examinations.
Common mistakes
- Using the population standard deviation.
- Ignoring topography in gauge placement.
Assumptions and limits
- Station rainfall over the same period.
References
- Classical engineering hydrology relations
Questions and answers
How many gauges for these five stations at 10 % error?
Mean 822 mm, C_v 17.8 %: four gauges, so the five existing ones suffice.
What if 5 % error is wanted?
N rises fourfold, to 13 gauges.
What do the defaults represent?
Five stations recording 820, 650, 720, 900 and 1,020 mm of annual rainfall, allowable error 10 %.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.