FireCADCalc

Open Well Yield by Recuperation Test

Specific yield of an open well from a recuperation test (depression before and after a recovery time) and the safe yield for a working depression head.

Inputs

Examples: Illustrative 5 m well, fine sandClayey bottom, slow recoveryCoarse sand, fast recovery

Accepted: 0.01 to 50 m
Accepted: 0.001 to 50 m
Accepted: 0.016667 to 24 h
Accepted: 0.5 to 30 m
Accepted: 0.1 to 30 m

Results

After pumping stops, water flows in through the well bottom at a rate proportional to the depression, so the depression decays exponentially: K/A = (1/T)ln(s₁/s₂) = (2.303/T)log(s₁/s₂). The yield at a working depression H is Q = (K/A)·A·H. Working heads are kept below the critical depression that would disturb the soil at the bottom (often 2.5–3.5 m in sand). Typical K/A is about 0.25 per hour in clay, 0.5 in fine sand and 1 in coarse sand.

Specific yield (per hour)1.19451/h
Well area28.274m²
Safe yield101.32m³/h
Safe yield per day2,431.7m³/d

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 5 m well, fine sand. The inputs, in the units selected above:

InputValue
Depression when pumping stops3.0000 m
Depression after the recovery time1.0000 m
Recovery time2.0000 h
Well diameter5.0000 m
Safe working depression head2.5000 m

Applying the formula below gives:

ResultValue
Specific yield (per hour)0.54931 1/h
Well area19.635 m²
Safe yield26.964 m³/h
Safe yield per day647.14 m³/d

Open this example in the calculator and change any input.

Formula

\(\frac KA = \frac{2.303}{T}\log\frac{s_1}{s_2}, \quad Q = \frac KA\,A\,H\)

Variables

Symbol Meaning SI unit
\(s_1\) Depression when pumping stops m
\(s_2\) Depression after the recovery time m
\(T\) Recovery time s
\(d\) Well diameter m
\(H\) Safe working depression head m
\(K/A\) Specific yield (per hour) 1/s
\(A\) Well area m²
\(Q\) Safe yield m³/s
\(Q_d\) Safe yield per day m³/s

Method and standards

Recuperation test.

Where it is used

  • Village and farm open wells.
  • Civil engineering examinations.

Common mistakes

  • Using a working head above the critical depression.
  • Ignoring seasonal water-table change.

Assumptions and limits

  • Inflow through the bottom only.

References

  • Classical engineering hydrology relations: recuperation test of open wells

Questions and answers

What is the yield of a 5 m well whose depression recovers from 3 m to 1 m in 2 hours?

K/A = 0.549 per hour; at 2.5 m working head, about 27 m³/h.

What K/A is typical for fine sand?

About 0.5 per hour.

What do the defaults represent?

An illustrative 5 m diameter open well recovering from 3 m to 1 m depression in 2 hours, worked at 2.5 m depression.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.