Boiler Capacity for a Sugar Mill

Boiler steam needed for a crush from steam % cane, the design margin, and the rating of each boiler for the number in service and on standby.

Sugar mill and cogenerationDistillery and ethanolBoiler

Inputs

Examples: 5000 TCD, two boilers2500 TCD with standby5000 TCD, 90 % time efficiency

Crushing hours over 24 h; 85 to 95 % is common once mill stoppages are counted. At 100 % the crush is taken as steady over the day.

Results

Add the off-season and distillery loads if the boiler serves them.

Steam demand while crushing115.74t/h
Required capacity with margin127.31t/h
Rating of each boiler63.657t/h
Installed capacity127.31t/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 5000 TCD, two boilers. The inputs, in the units selected above:

InputValue
Cane crushed per day5,000.0 t/d
Boiler steam % cane50.000 %
Design margin10.000 %
Boilers in service2.0000 -
Standby boilers0 -
Time efficiency (share of the day the mill crushes)100.00 %

Applying the formula below gives:

ResultValue
Steam demand while crushing104.17 t/h
Required capacity with margin114.58 t/h
Rating of each boiler57.292 t/h
Installed capacity114.58 t/h

Open this example in the calculator and change any input.

Formula

\(\dot m_s = \frac{TCD\,s_b}{\eta_t}, \quad \dot m_r = \dot m_s (1 + k), \quad \dot m_1 = \frac{\dot m_r}{N}, \quad \dot m_i = \dot m_1 (N + N_s)\)

Variables

Symbol Meaning SI unit
\(TCD\) Cane crushed per day kg/s
\(s_b\) Boiler steam % cane -
\(k\) Design margin -
\(N\) Boilers in service -
\(N_s\) Standby boilers -
\(\dot m_s\) Steam demand while crushing kg/s
\(\eta_t\) Time efficiency: crushing hours over 24 h -
\(\dot m_r\) Required capacity with margin kg/s
\(\dot m_1\) Rating of each boiler kg/s
\(\dot m_i\) Installed capacity kg/s

Method and standards

Steam balance: steam from the daily crush and steam % cane, raised by the time efficiency to the rate while the mill is crushing, a design margin on top, shared between the boilers in service; standby boilers add installed capacity of the same rating.

Where it is used

  • Boiler enquiries.
  • Expansion planning.

Common mistakes

  • Process steam used for boiler steam.

Assumptions and limits

  • The time efficiency spreads the day's crush over the crushing hours. Short peaks above the mean crushing rate are not included: put them in the margin.
  • Whole numbers of boilers.

References

  • Steam balance: steam = TCD × steam % cane; margin and redundancy by design

Questions and answers

Steam % cane for sizing?

Use the boiler steam including turbines, not only process steam.

One large or two smaller boilers?

Two give availability during cleaning and trips; one is cheaper and more efficient.

Cogeneration?

Size for the turbine's throttle steam, which may exceed process demand.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.