FireCADCalc

Fuel Equivalence: How Much Fuel B Replaces Fuel A

Rate of a second fuel that delivers the same useful heat as a first fuel, from both calorific values and the boiler efficiency on each.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolBoiler

Inputs

Examples: Coal to bagasseCoal to husk

Results

Fuel B rate11.226t/h
Tonnes of B per tonne of A2.8065

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Coal to bagasse. The inputs, in the units selected above:

InputValue
Fuel A rate4.0000 t/h
Fuel A GCV23,000 kJ/kg
Efficiency on fuel A (on GCV)82.000 %
Fuel B GCV9,600.0 kJ/kg
Efficiency on fuel B (on GCV)70.000 %

Applying the formula below gives:

ResultValue
Fuel B rate11.226 t/h
Tonnes of B per tonne of A2.8065

Open this example in the calculator and change any input.

Formula

\(\frac{\dot m_B}{\dot m_A} = \frac{GCV_A \eta_A}{GCV_B \eta_B}\)

Variables

Symbol Meaning SI unit
\(\dot m_A\) Fuel A rate kg/s
\(GCV_A\) Fuel A GCV J/kg
\(\eta_A\) Efficiency on fuel A -
\(GCV_B\) Fuel B GCV J/kg
\(\eta_B\) Efficiency on fuel B -
\(\dot m_B\) Fuel B rate kg/s
\(\dot m_B/\dot m_A\) Tonnes of B per tonne of A -

Method and standards

Useful heat balance: the same steam output needs the same useful heat, \(\dot m_B\,GCV_B\,\eta_B = \dot m_A\,GCV_A\,\eta_A\).

Where it is used

  • Fuel switching studies.
  • Off-season fuel planning.

Common mistakes

  • Ignoring the efficiency difference.

Assumptions and limits

  • Same steam output.
  • Calorific values and efficiencies must share one basis: gross values with efficiencies on GCV (as labelled), or net values with net efficiencies. Mixing a GCV with a net efficiency gives a wrong ratio and cannot be detected.

References

  • Useful heat balance between two fuels (definition)

Questions and answers

Why include efficiency?

Wet fuels lose more heat in the stack, so more fuel is needed than the calorific values alone suggest.

Same basis?

Both GCVs with gross efficiencies, or both NCVs with net.

Handling?

Two or three times the tonnage of biomass needs bigger feeders and storage.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.