Worked example
Example: 5000 TCD, two boilers. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Cane crushed per day | 5,000.0 t/d |
| Boiler steam % cane | 50.000 % |
| Design margin | 10.000 % |
| Boilers in service | 2.0000 - |
| Standby boilers | 0 - |
| Time efficiency (share of the day the mill crushes) | 100.00 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Steam demand while crushing | 104.17 t/h |
| Required capacity with margin | 114.58 t/h |
| Rating of each boiler | 57.292 t/h |
| Installed capacity | 114.58 t/h |
Open this example in the calculator and change any input.
Formula
\(\dot m_s = \frac{TCD\,s_b}{\eta_t}, \quad \dot m_r = \dot m_s (1 + k), \quad \dot m_1 = \frac{\dot m_r}{N}, \quad \dot m_i = \dot m_1 (N + N_s)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(TCD\) | Cane crushed per day | kg/s |
| \(s_b\) | Boiler steam % cane | - |
| \(k\) | Design margin | - |
| \(N\) | Boilers in service | - |
| \(N_s\) | Standby boilers | - |
| \(\dot m_s\) | Steam demand while crushing | kg/s |
| \(\eta_t\) | Time efficiency: crushing hours over 24 h | - |
| \(\dot m_r\) | Required capacity with margin | kg/s |
| \(\dot m_1\) | Rating of each boiler | kg/s |
| \(\dot m_i\) | Installed capacity | kg/s |
Method and standards
Steam balance: steam from the daily crush and steam % cane, raised by the time efficiency to the rate while the mill is crushing, a design margin on top, shared between the boilers in service; standby boilers add installed capacity of the same rating.
Where it is used
- Boiler enquiries.
- Expansion planning.
Common mistakes
- Process steam used for boiler steam.
Assumptions and limits
- The time efficiency spreads the day's crush over the crushing hours. Short peaks above the mean crushing rate are not included: put them in the margin.
- Whole numbers of boilers.
References
- Steam balance: steam = TCD × steam % cane; margin and redundancy by design
Questions and answers
Steam % cane for sizing?
Use the boiler steam including turbines, not only process steam.
One large or two smaller boilers?
Two give availability during cleaning and trips; one is cheaper and more efficient.
Cogeneration?
Size for the turbine's throttle steam, which may exceed process demand.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.