Worked example
Example: Illustrative 1.2 m pipe, 2.5 m3/s. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Design flow | 9,000.0 m³/h |
| Pipe diameter | 1,200.0 mm |
| Culvert length | 30.000 m |
| Culvert slope | 1.0000 % |
| Manning roughness | 0.013000 - |
| Entrance loss coefficient | 0.50000 - |
| Inlet orifice coefficient | 0.60000 - |
| Tailwater depth above outlet invert | 0.80000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Full-pipe velocity | 2.2105 m/s |
| Headwater, inlet control | 1.2920 m |
| Headwater, outlet control | 1.3970 m |
| Design headwater | 1.3970 m |
| Headwater to diameter ratio | 1.1642 |
Open this example in the calculator and change any input.
Formula
\(HW_i = \frac{Q^2}{2gC_d^2A^2} + \frac D2, \quad HW_o = \max(TW, D) + \left(1 + k_e + \frac{2gn^2L}{R^{4/3}}\right)\frac{V^2}{2g} - S_0L\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q\) | Design flow | m³/s |
| \(D\) | Pipe diameter | m |
| \(L\) | Culvert length | m |
| \(S_0\) | Culvert slope | - |
| \(n\) | Manning roughness | - |
| \(k_e\) | Entrance loss coefficient | - |
| \(C_d\) | Inlet orifice coefficient | - |
| \(TW\) | Tailwater depth above outlet invert | m |
| \(V\) | Full-pipe velocity | m/s |
| \(HW_i\) | Headwater, inlet control | m |
| \(HW_o\) | Headwater, outlet control | m |
| \(HW\) | Design headwater | m |
| \(HW/D\) | Headwater to diameter ratio | - |
Method and standards
Culvert control.
Where it is used
- Road and rail drainage.
- Checking existing culverts for higher flows.
Common mistakes
- Checking only one control.
- Using unsubmerged inlets with the orifice formula.
Assumptions and limits
- Circular pipe; submerged inlet; steady flow.
References
- Culvert hydraulics
- inlet and outlet control
Questions and answers
What headwater is acceptable?
Often HW/D up to about 1.2–1.5, limited by road level and upstream flooding.
Why does outlet control depend on length?
Friction loss grows with length; long culverts on flat slopes are usually outlet-controlled.
What do the defaults represent?
An illustrative 1.2 m concrete pipe culvert, 30 m long on a 1 % slope, carrying 2.5 m³/s with 0.8 m tailwater.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Chow, Open-Channel Hydraulics (McGraw-Hill, 1959)