Worked example
Example: Illustrative 11 kV generator. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Incoming generator frequency | 50.120 Hz |
| Bus frequency | 50.000 Hz |
| Incoming generator voltage | 11,100 V |
| Bus voltage | 11,000 V |
| Present phase angle between them | 10.000 ° |
| Breaker closing time | 80.000 ms |
Applying the formula below gives:
| Result | Value |
|---|---|
| Slip frequency | 0.12000 Hz |
| Beat (slip) period | 8.3333 s |
| Advance angle to cover the breaker closing time | 3.4560 ° |
| Voltage across the open breaker at δ | 1,928.7 V |
| Maximum voltage across the breaker (out of phase) | 22,100 V |
| Voltage mismatch | 0.90909 % |
Open this example in the calculator and change any input.
Formula
\(\Delta f = f_g - f_b, \quad \delta_{adv} = 360°\,\Delta f\,t_{cb}, \quad V_{CB} = \sqrt{V_g^2 + V_b^2 - 2V_gV_b\cos\delta}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(f_g\) | Incoming generator frequency | 1/s |
| \(f_b\) | Bus frequency | 1/s |
| \(V_g\) | Incoming generator voltage | V |
| \(V_b\) | Bus voltage | V |
| \(\delta\) | Present phase angle between them | rad |
| \(t_{cb}\) | Breaker closing time | s |
| \(\Delta f\) | Slip frequency | 1/s |
| \(T_s\) | Beat (slip) period | s |
| \(\delta_{adv}\) | Advance angle to cover the breaker closing time | rad |
| \(V_{CB}\) | Voltage across the open breaker at δ | V |
| \(V_{CB,max}\) | Maximum voltage across the breaker (out of phase) | V |
| \(\Delta V\) | Voltage mismatch | - |
Method and standards
Synchronising.
Where it is used
- Setting up synchronisers and check-synchronising relays.
- Training on manual synchronising.
Common mistakes
- Ignoring the breaker closing time.
- Closing with the generator slow (reverse power).
Assumptions and limits
- Steady slip during the closing time; balanced three-phase voltages.
References
- Synchronising of synchronous machines
Questions and answers
Why should the generator run slightly fast?
So that on closing it takes up a little load rather than motoring.
What happens if the breaker closes far out of phase?
Large circulating current and torque transients that can damage the shaft and couplings.
What do the defaults represent?
An illustrative 11 kV generator at 50.12 Hz and 11.1 kV synchronising to a 50 Hz, 11 kV bus, now 10° apart, with an 80 ms breaker.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Kundur, Power System Stability and Control (McGraw-Hill, 1994)