Worked example
Example: Illustrative 30 GVA, H 4 s, 1320 MW loss. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Rating of synchronous machines online | 30,000 MVA |
| Average inertia constant | 4.0000 s |
| Generation lost | 1,320.0 MW |
| Nominal frequency | 50.000 Hz |
| Frequency deviation limit (for the time) | 0.80000 Hz |
Applying the formula below gives:
| Result | Value |
|---|---|
| Stored kinetic energy | 120.00 GJ |
| Initial rate of change of frequency (Hz/s) | 0.27500 |
| Time to reach the deviation limit without response | 2.9091 s |
| Inertia constant needed to keep RoCoF at 1 Hz/s | 1.1000 s |
Open this example in the calculator and change any input.
Formula
\(E_k = HS, \quad \frac{df}{dt} = \frac{\Delta P f_0}{2HS}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(S\) | Rating of synchronous machines online | VA |
| \(H\) | Average inertia constant | s |
| \(\Delta P\) | Generation lost | W |
| \(f_0\) | Nominal frequency | 1/s |
| \(\Delta f\) | Frequency deviation limit (for the time) | 1/s |
| \(E_k\) | Stored kinetic energy | J |
| \(df/dt\) | Initial rate of change of frequency (Hz/s) | - |
| \(t\) | Time to reach the deviation limit without response | s |
| \(H_{min}\) | Inertia constant needed to keep RoCoF at 1 Hz/s | s |
Method and standards
System inertia.
Where it is used
- Grid planning with high renewable shares.
- Sizing fast frequency response and synthetic inertia.
Common mistakes
- Counting inverter-based plant in S.
- Using the post-response frequency nadir instead of the initial RoCoF.
Assumptions and limits
- Single-area system; first instant after the loss.
References
- Aggregate swing equation of a power system
Questions and answers
Why does inertia fall with more renewables?
Inverter-connected wind and solar do not have rotating masses coupled to the grid, so the kinetic energy that slows the first frequency drop shrinks.
What RoCoF limits are used?
Many grids plan for 0.5–1 Hz/s; protection relays on some distributed generators trip above about 0.5–1 Hz/s.
What do the defaults represent?
An illustrative 30 GVA of synchronous machines with H = 4 s losing a 1,320 MW unit on a 50 Hz grid, with a 0.8 Hz deviation limit.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 3