Economic Dispatch of Two Generating Units (Equal Incremental Cost)

Loading of two generating units for the lowest fuel cost by equal incremental cost, from their quadratic cost curves, the demand and unit limits.

Thermal power plant

Inputs

Examples: Illustrative two units for 400 MWUnit 1 at its maximumLight load

Accepted: 0 to 1,000,000
Accepted: 1E-9 to 1,000
Accepted: 0 to 1,000,000
Accepted: 1E-9 to 1,000
Accepted: 0.001 to 100,000 MW
Accepted: 0 to 100,000 MW
Accepted: 0.001 to 100,000 MW
Accepted: 0 to 100,000 MW
Accepted: 0.001 to 100,000 MW

Results

With fuel costs F_i = a_i + b_i P_i + c_i P_i² (P in MW, cost per hour), total cost is lowest when both units run at the same incremental cost dF/dP = b_i + 2c_i P_i = λ. Solving for λ such that the outputs add up to the demand gives the dispatch; a unit that reaches a limit is held there and the other takes the rest. Fixed costs a_i do not change the dispatch, so they are left out of the cost shown. Transmission losses are ignored.

Unit 1 output59.091MW
Unit 2 output90.909MW
System incremental cost (per MWh)9.1818
Variable fuel cost per hour1,243.2

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative two units for 400 MW. The inputs, in the units selected above:

InputValue
Unit 1 linear cost coefficient (per MWh)7.0000 -
Unit 1 quadratic coefficient (per MW²h)0.008000 -
Unit 2 linear cost coefficient (per MWh)7.5000 -
Unit 2 quadratic coefficient (per MW²h)0.009600 -
Demand400.00 MW
Unit 1 minimum50.000 MW
Unit 1 maximum250.00 MW
Unit 2 minimum50.000 MW
Unit 2 maximum250.00 MW

Applying the formula below gives:

ResultValue
Unit 1 output232.39 MW
Unit 2 output167.61 MW
System incremental cost (per MWh)10.718
Variable fuel cost per hour3,585.5

Open this example in the calculator and change any input.

Formula

\(\frac{dF_i}{dP_i} = b_i + 2c_iP_i = \lambda, \quad P_1 + P_2 = P_D\)

Variables

Symbol Meaning SI unit
\(b_1\) Unit 1 linear cost coefficient (per MWh) -
\(c_1\) Unit 1 quadratic coefficient (per MW²h) -
\(b_2\) Unit 2 linear cost coefficient (per MWh) -
\(c_2\) Unit 2 quadratic coefficient (per MW²h) -
\(P_D\) Demand W
\(P_{1,min}\) Unit 1 minimum W
\(P_{1,max}\) Unit 1 maximum W
\(P_{2,min}\) Unit 2 minimum W
\(P_{2,max}\) Unit 2 maximum W
\(P_1\) Unit 1 output W
\(P_2\) Unit 2 output W
\(\lambda\) System incremental cost (per MWh) -
\(F\) Variable fuel cost per hour -

Method and standards

Economic dispatch.

Where it is used

  • Captive and cogeneration plants with several units.
  • Teaching power system operation.

Common mistakes

  • Including fixed costs in the incremental cost.
  • Ignoring unit limits.

Assumptions and limits

  • Quadratic cost curves; no losses; both units running.

References

  • Equal incremental cost rule with unit limits

Questions and answers

Why equal incremental costs?

If one unit's incremental cost were lower, moving load to it would cut total cost; the optimum is reached when no such move helps.

What happens at a unit limit?

That unit stays at its limit and the others share the rest at equal incremental cost.

What do the defaults represent?

Two illustrative units with costs 7.0 + 0.016P and 7.5 + 0.0192P per MWh supplying 400 MW.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Grainger and Stevenson, Power System Analysis (McGraw-Hill, 1994)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.