Worked example
Example: Illustrative gas vs coal. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Plant 1 capital cost (per kW) | 900.00 - |
| Plant 1 fixed O&M (per kW·year) | 20.000 - |
| Plant 1 efficiency | 38.000 % |
| Plant 1 fuel price (per GJ) | 9.0000 - |
| Plant 2 capital cost (per kW) | 2,200.0 - |
| Plant 2 fixed O&M (per kW·year) | 45.000 - |
| Plant 2 efficiency | 40.000 % |
| Plant 2 fuel price (per GJ) | 3.0000 - |
| Discount rate | 8.0000 % |
| Life (years) | 25.000 - |
| Capacity factor to compare at | 60.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Plant 1 annual fixed cost (per kW·year) | 104.31 |
| Plant 1 variable cost (per MWh) | 85.263 |
| Plant 2 annual fixed cost (per kW·year) | 251.09 |
| Plant 2 variable cost (per MWh) | 27.000 |
| Crossover capacity factor | 28.759 % |
| Plant 1 cost per kW·year at CF | 552.45 |
| Plant 2 cost per kW·year at CF | 393.01 |
Open this example in the calculator and change any input.
Formula
\(Y = CRF\cdot C + O + 8.76\,v\,CF, \quad v = \frac{3.6c_f}{\eta}, \quad CF^* = \frac{A_2 - A_1}{8.76(v_1 - v_2)}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(C_1\) | Plant 1 capital cost (per kW) | - |
| \(O_1\) | Plant 1 fixed O&M (per kW·year) | - |
| \(\eta_1\) | Plant 1 efficiency | - |
| \(c_{f,1}\) | Plant 1 fuel price (per GJ) | - |
| \(C_2\) | Plant 2 capital cost (per kW) | - |
| \(O_2\) | Plant 2 fixed O&M (per kW·year) | - |
| \(\eta_2\) | Plant 2 efficiency | - |
| \(c_{f,2}\) | Plant 2 fuel price (per GJ) | - |
| \(i\) | Discount rate | - |
| \(n\) | Life (years) | - |
| \(CF\) | Capacity factor to compare at | - |
| \(A_1\) | Plant 1 annual fixed cost (per kW·year) | - |
| \(v_1\) | Plant 1 variable cost (per MWh) | - |
| \(A_2\) | Plant 2 annual fixed cost (per kW·year) | - |
| \(v_2\) | Plant 2 variable cost (per MWh) | - |
| \(CF^*\) | Crossover capacity factor | - |
| \(Y_1\) | Plant 1 cost per kW·year at CF | - |
| \(Y_2\) | Plant 2 cost per kW·year at CF | - |
Method and standards
Screening curves.
Where it is used
- Generation expansion screening.
- Teaching power system economics.
Common mistakes
- Comparing plants on capital cost alone.
- Mixing fuel prices per GJ HHV and LHV with efficiencies on another basis.
Assumptions and limits
- Constant prices; no unit commitment or reserve value.
References
- Screening-curve method of generation planning
Questions and answers
What do screening curves show?
For each plant, cost per kW-year rises linearly with running hours; cheap-to-build, expensive-to-run plants win at low capacity factors and the reverse at high ones.
Why does the crossover matter?
Combined with the load duration curve it tells planners how much of each plant type the system needs.
What do the defaults represent?
An illustrative gas plant (900 per kW, 38 %, fuel 9 per GJ) against a coal plant (2,200 per kW, 40 %, fuel 3 per GJ) at 8 % over 25 years, compared at 60 % capacity factor.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 5