Learning Curve: Cost Reduction with Cumulative Production

Unit cost after cumulative production grows, by an experience (learning) rate per doubling, and the cumulative volume needed to reach a target cost.

Thermal power plant

Inputs

Examples: Illustrative 20 % learning, 100 to 800 unitsWind 12 % learningBatteries 18 %

Accepted: 1E-6 to 1E+12
Accepted: 1E-6 to 1E+15
Accepted: 1 to 60 %
Accepted: 1E-6 to 1E+15
Accepted: 1E-6 to 1E+12

Results

Wright's law C = C₀(Q/Q₀)^(−b), b = −log₂(1 − LR). Solar PV modules have shown learning rates near 20 %, wind turbines about 10–15 %, batteries about 18–20 %.

Experience exponent −log₂(1 − LR)0.32193
Unit cost at Q512.00
Doublings3.0000
Cumulative production for the target cost861.16

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 20 % learning, 100 to 800 units. The inputs, in the units selected above:

InputValue
Current unit cost1,000.0 -
Current cumulative production100.00 -
Learning rate (cost fall per doubling)20.000 %
Future cumulative production800.00 -
Target unit cost500.00 -

Applying the formula below gives:

ResultValue
Experience exponent −log₂(1 − LR)0.32193
Unit cost at Q512.00
Doublings3.0000
Cumulative production for the target cost861.16

Open this example in the calculator and change any input.

Formula

\(C = C_0\left(\frac{Q}{Q_0}\right)^{-b}, \quad b = -\log_2(1 - LR)\)

Variables

Symbol Meaning SI unit
\(C_0\) Current unit cost -
\(Q_0\) Current cumulative production -
\(LR\) Learning rate (cost fall per doubling) -
\(Q\) Future cumulative production -
\(C_t\) Target unit cost -
\(b\) Experience exponent −log₂(1 − LR) -
\(C\) Unit cost at Q -
\(\log_2(Q/Q_0)\) Doublings -
\(Q_t\) Cumulative production for the target cost -

Method and standards

Learning curve.

Where it is used

  • Technology cost projections.
  • Manufacturing cost planning.

Common mistakes

  • Using annual instead of cumulative production.
  • Extrapolating far beyond the data.

Assumptions and limits

  • Constant learning rate.

References

  • Wright's learning (experience) curve

Questions and answers

What does a 20 % learning rate mean?

Each doubling of cumulative production cuts unit cost to 80 % of its previous value.

Why use cumulative production rather than time?

Costs fall with accumulated experience in making and installing, not with the calendar; slow deployment slows cost reduction.

What do the defaults represent?

An illustrative cost of 1,000 per unit after 100 units, a 20 % learning rate, forecast at 800 cumulative units and the volume needed to halve the cost.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 8

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.