FireCADCalc

Present Value of an Escalating Yearly Cost

Present value, total and levelised yearly equivalent of a cost that grows at a fixed escalation rate each year, such as fuel or energy, over a life.

Inputs

Examples: 1 M a year rising 5 %, 10 % discount, 15 years2.5 M rising 8 %, 8 % discount, 20 years0.5 M flat, 12 % discount, 10 years

Results

Costs paid at the end of each year, the first one year from now.

Present value of all the costs1.0046e+07
Total of the costs, not discounted2.1579e+07
Cost in the last year1,979,932
Levelised (equal) yearly cost with the same present value1,320,841

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1 M a year rising 5 %, 10 % discount, 15 years. The inputs, in the units selected above:

InputValue
Cost in the first year (your currency)1,000,000 -
Escalation per year5.0000 %
Discount rate10.000 %
Number of years15.000 -

Applying the formula below gives:

ResultValue
Present value of all the costs1.0046e+07
Total of the costs, not discounted2.1579e+07
Cost in the last year1,979,932
Levelised (equal) yearly cost with the same present value1,320,841

Open this example in the calculator and change any input.

Formula

\(PV = C_1 \frac{1 - \left(\frac{1+g}{1+i}\right)^n}{i - g} \ \ (i \ne g), \quad PV = \frac{n C_1}{1 + i} \ \ (i = g)\)

\(\Sigma C = C_1 \frac{(1+g)^n - 1}{g}, \quad C_n = C_1 (1+g)^{n-1}, \quad C_{lev} = PV \cdot \frac{i(1+i)^n}{(1+i)^n - 1}\)

Variables

Symbol Meaning SI unit
\(C_1\) Cost in the first year (your currency) -
\(g\) Escalation per year -
\(i\) Discount rate -
\(n\) Number of years -
\(PV\) Present value of all the costs -
\(\Sigma C\) Total of the costs, not discounted -
\(C_n\) Cost in the last year -
\(C_{lev}\) Levelised (equal) yearly cost with the same present value -
\(CRF\) Capital recovery factor -

Method and standards

The present value of a geometric gradient series with end-of-year payments; the levelised amount uses the capital recovery factor.

Where it is used

  • Fuel and energy cost in life-cycle comparisons.
  • Comparing a more efficient boiler or motor over its life.
  • Levelising escalating O&M costs.

Common mistakes

  • Applying escalation from year 0 instead of year 1.
  • Mixing real and nominal rates.
  • Forgetting the first payment is a year away.

Assumptions and limits

  • End-of-year payments; constant rates.

References

  • Geometric gradient series (engineering economics; Newnan, Engineering Economic Analysis)

Questions and answers

What is 1 M a year rising 5 % worth today at 10 % over 15 years?

10.05 M; undiscounted the 15 payments add to 21.6 M and the last is 1.98 M.

What is the levelised cost?

The equal yearly amount with the same present value: 1.32 M a year here.

What if escalation equals the discount rate?

Each year's present value is the same, C₁/(1 + i), so PV = n C₁/(1 + i).

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.