Worked example
Example: Energy project. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Investment | 1,200,000 - |
| Annual saving | 450,000 - |
| Extra annual running cost | 30,000 - |
| Life (years) | 10.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Net annual saving | 420,000 |
| Simple payback (years) | 2.8571 |
| Simple return (net saving / investment) | 35.000 % |
| Lifetime net gain | 3,000,000 |
Open this example in the calculator and change any input.
Formula
\(t_{pb} = \frac{I}{S - C_{om}}, \quad ROI = \frac{S - C_{om}}{I}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(I\) | Investment | - |
| \(S\) | Annual saving | - |
| \(C_{om}\) | Extra annual running cost | - |
| \(n\) | Life (years) | - |
| \(S_n\) | Net annual saving | - |
| \(t_{pb}\) | Simple payback (years) | - |
| \(ROI\) | Simple return (net saving / investment) | - |
| \(N\) | Lifetime net gain | - |
Method and standards
Definitions.
Where it is used
- Energy audit recommendations.
- Quick screening of projects.
Common mistakes
- Gross instead of net saving.
- Ignoring life.
Assumptions and limits
- Constant savings.
- With a net saving of zero or less the project never pays back and no payback period is shown.
References
- Payback = I/(S − C); ROI = (S − C)/I
Questions and answers
1.2 million invested to save 4.5 lakh a year with 30,000 running cost?
Payback 2.9 years; ROI 35 %.
Is simple payback enough?
For quick screening; use NPV for decisions.
Rising energy prices?
Payback shortens; see the discounted payback with escalation.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.