FireCADCalc

Levelised Cost of Electricity Storage (LCOS)

Levelised cost per MWh discharged of a battery or other store from energy and power cost, cycles, round-trip efficiency, life, discount rate and charging price.

Thermal power plant

Inputs

Examples: Illustrative 50 MW / 4 h battery, 300 cyclesPeaker 2 h, 100 cyclesPumped hydro 8 h, 250 cycles, 50 years

Accepted: 0.001 to 10,000 MW
Accepted: 0.25 to 1,000
Accepted: 0 to 10,000
Accepted: 0 to 10,000
Accepted: 0 to 20 %
Accepted: 20 to 100 %
Accepted: 10 to 100 %
Accepted: 1 to 2,000
Accepted: 1 to 60
Accepted: 0 to 30 %
Accepted: 0 to 1,000

Results

Nameplate energy = P·h/DoD; annual discharge = P·h·N_c; LCOS = (CRF + f_O&M)·C/E_d + c_ch/η_RT. Degradation, augmentation and end-of-life value are not included; add them for a bankable model.

Capital cost6.3056e+07
Capital recovery factor10.979%
Energy discharged per year60,000MWh
Capital cost per MWh discharged115.39
O&M cost per MWh discharged21.019
Charging cost per MWh discharged34.884
Levelised cost of storage per MWh171.29

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 50 MW / 4 h battery, 300 cycles. The inputs, in the units selected above:

InputValue
Power rating50.000 MW
Storage duration at rated power (hours)4.0000 -
Energy-related capital cost (currency per kWh)250.00 -
Power-related capital cost (currency per kW)150.00 -
Fixed O&M (fraction of capital per year)2.0000 %
Round-trip efficiency86.000 %
Usable depth of discharge90.000 %
Full cycles per year300.00 -
Life (years)15.000 -
Discount rate7.0000 %
Charging electricity price (currency per MWh)30.000 -

Applying the formula below gives:

ResultValue
Capital cost6.3056e+07
Capital recovery factor10.979 %
Energy discharged per year60,000 MWh
Capital cost per MWh discharged115.39
O&M cost per MWh discharged21.019
Charging cost per MWh discharged34.884
Levelised cost of storage per MWh171.29

Open this example in the calculator and change any input.

Formula

\(LCOS = \frac{(CRF + f_{O\&M})C}{E_d} + \frac{c_{ch}}{\eta_{RT}}, \quad C = c_E\frac{Ph}{DoD} + c_PP\)

Variables

Symbol Meaning SI unit
\(P\) Power rating W
\(h\) Storage duration at rated power (hours) -
\(c_E\) Energy-related capital cost (currency per kWh) -
\(c_P\) Power-related capital cost (currency per kW) -
\(f_{O\&M}\) Fixed O&M (fraction of capital per year) -
\(\eta_{RT}\) Round-trip efficiency -
\(DoD\) Usable depth of discharge -
\(N_c\) Full cycles per year -
\(n\) Life (years) -
\(i\) Discount rate -
\(c_{ch}\) Charging electricity price (currency per MWh) -
\(C\) Capital cost -
\(CRF\) Capital recovery factor -
\(E_d\) Energy discharged per year J
\(c_{cap}\) Capital cost per MWh discharged -
\(c_{O\&M}\) O&M cost per MWh discharged -
\(c_{ch}/\eta\) Charging cost per MWh discharged -
\(LCOS\) Levelised cost of storage per MWh -

Method and standards

Levelised cost of storage.

Where it is used

  • Comparing battery, pumped hydro and hydrogen storage.
  • Arbitrage and capacity business cases.

Common mistakes

  • Dividing by nameplate rather than discharged energy.
  • Ignoring the efficiency loss on charging energy.

Assumptions and limits

  • Constant cycles and prices; no degradation.

References

  • Levelised cost of storage with a capital recovery factor

Questions and answers

What drives storage cost per MWh?

Cycles per year: a 4-hour battery cycled daily spreads its capital over ten times more energy than one used for 30 peaks a year.

Why add the charging price over efficiency?

Every MWh discharged needs 1/η MWh of charging energy; at 86 % efficiency that adds 16 % to the charging price.

What do the defaults represent?

An illustrative 50 MW / 4 h battery at 250 per kWh and 150 per kW, 2 % O&M, 86 % round trip, 90 % depth of discharge, 300 cycles a year, 15 years at 7 % and charging at 30 per MWh.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 5

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.