Condensate formed in a steam main during warm-up and in normal running, from the steel mass, steam pressure, warm-up time and heat loss, for steam trap sizing.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paperFood, dairy and textileIAPWS-IF97 (water and steam)Boiler

Inputs

Examples: DN150 main, 100 m (2 830 kg steel), 10.5 bar(a), warm-up 30 min, loss 6.2 kWDN100 main, 50 m (805 kg), 4 bar(a), warm-up 15 min, loss 2.2 kWDN300 HP line, 200 m (19 600 kg), 66 bar(a), warm-up 2 h, loss 50 kW

Pipe mass per metre × length, plus flanges and valves. DN150 schedule 40 is 28.3 kg/m, DN100 is 16.1 kg/m (ASME B36.10).
Carbon steel about 0.49 kJ/(kg·K).
From the pipe insulation heat loss calculator (W/m × length).

Results

Latent heat at the final pressure: warm-up condensate is slightly high (safe for trap sizing). For a superheated main the running load is an upper bound.

Mean condensate rate during warm-up216.99kg/h
Condensate formed during warm-up108.50kg
Running condensate load11.122kg/h
Steam saturation temperature182.02°C
Latent heat of the steam2,006.8kJ/kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: DN150 main, 100 m (2 830 kg steel), 10.5 bar(a), warm-up 30 min, loss 6.2 kW. The inputs, in the units selected above:

InputValue
Mass of pipe, flanges and fittings to heat2,830.0 kg
Specific heat of the pipe material0.49000 kJ/(kg·K)
Starting (ambient) temperature25.000 °C
Steam pressure (absolute)10.500 bar
Warm-up time30.000 min
Heat loss of the main in normal running6.2000 kW

Applying the formula below gives:

ResultValue
Mean condensate rate during warm-up216.99 kg/h
Condensate formed during warm-up108.50 kg
Running condensate load11.122 kg/h
Steam saturation temperature182.02 °C
Latent heat of the steam2,006.8 kJ/kg

Open this example in the calculator and change any input.

Formula

\(m_w = \frac{W\,c_p\,(T_{sat} - T_a)}{h_{fg}} \qquad \dot m_w = \frac{m_w}{t_w} \qquad \dot m_r = \frac{\dot Q_l}{h_{fg}}\)

Variables

Symbol Meaning SI unit
\(W\) mass of pipe, flanges and fittings kg
\(c_p\) specific heat of the pipe material J/(kg·K)
\(T_a\) starting temperature K
\(p\) steam pressure, absolute Pa
\(t_w\) warm-up time s
\(\dot Q_l\) heat loss in normal running W
\(\dot m_w\) mean condensate rate during warm-up kg/s
\(m_w\) condensate formed during warm-up kg
\(\dot m_r\) running condensate load kg/s
\(T_{sat}\) steam saturation temperature K
\(h_{fg}\) latent heat of the steam J/kg

Method and standards

Energy balance: the steel is heated to the saturation temperature by condensing steam (the method of Spirax Sarco's The Steam and Condensate Loop), and in running the heat loss is made up by condensation. Saturation temperature and latent heat from FireCAD's IAPWS-IF97.

Where it is used

  • Sizing steam traps on mains, drip legs and process users.
  • Start-up warm-up loads of steam mains.
  • Trap surveys and replacement programmes.

Common mistakes

  • Sizing traps on running load only; warm-up load is several times larger.
  • Using the inlet pressure only and forgetting back pressure.
  • Applying too large a safety factor, which makes traps cycle and wear.

Assumptions and limits

  • Insulation mass and the heat loss during warm-up are neglected (a few per cent).
  • The mean warm-up rate; the peak at the start is higher.
  • Superheated steam mains form little running condensate while the superheat lasts; the running load here uses the latent heat as if saturated, so for a superheated main it is an upper bound.
  • Warm-up uses the latent heat at the final steam pressure. During warm-up the main is at lower pressure, where the latent heat is larger, so the warm-up condensate is slightly overestimated (on the safe side for trap sizing).

References

  • Energy balance on the pipe (Spirax Sarco, The Steam and Condensate Loop, method)
  • IAPWS R7-97(2012) IF97

Questions and answers

How much condensate forms when a steam main warms up?

Steel mass × specific heat × temperature rise ÷ latent heat. 100 m of DN150 pipe (2 830 kg) heated from 25 °C to 182 °C by 10.5 bar(a) steam condenses 108 kg; over 30 minutes that is 217 kg/h.

And in normal running?

Heat loss ÷ latent heat. A loss of 6.2 kW condenses 11 kg/h, so the warm-up load is about 20 times the running load, which is why mains are warmed slowly.

How big should the trap be?

Trap makers apply a safety factor to these loads and size on the pressure difference available at the trap; the factor is theirs or your specification's.

Method and article reviewed by FireCAD engineering on 10 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.