Worked example
Example: 2 to 46 bar(a) at 100 °C/h. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Starting pressure (absolute) | 2.0000 bar |
| Final pressure (absolute) | 46.000 bar |
| Allowed saturation temperature ramp | 100.00 °C/h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Saturation temperature at start | 120.21 °C |
| Saturation temperature at end | 258.78 °C |
| Time to raise pressure | 1.3857 h |
| Pressure rise per kelvin at the start (kPa per K) | 6.3261 kPa |
Open this example in the calculator and change any input.
Formula
\(t = \frac{T_{sat}(p_2) - T_{sat}(p_1)}{\dot T}, \quad \frac{dp}{dT}\Big|_{p_1}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(p_1\) | Starting pressure (absolute) | Pa |
| \(p_2\) | Final pressure (absolute) | Pa |
| \(\dot T\) | Allowed saturation temperature ramp | K/s |
| \(T_{sat,1}\) | Saturation temperature at start | K |
| \(T_{sat,2}\) | Saturation temperature at end | K |
| \(t\) | Time to raise pressure | s |
| \(dp/dT\) | Pressure rise per kelvin at the start | Pa/K |
Method and standards
IAPWS-IF97 saturation line: saturation temperatures at the two pressures, the time as their difference over the ramp, and dp/dT at the start by a central difference of the saturation pressure over ±0.01 K.
Where it is used
- Start-up procedures.
- Operator training.
Common mistakes
- Gauge pressures.
Assumptions and limits
- Uniform ramp.
- The ramp limit is on metal temperature; the drum and header metal lags the saturation temperature during a fast rise, so following the saturation ramp exactly is slightly non-conservative. Use the maker's start-up curve.
References
- Saturation temperature and pressure from IAPWS-IF97; dp/dT by central difference
Questions and answers
Why ramp on temperature, not pressure?
Thermal stress follows metal temperature, which follows saturation temperature.
Why is low-pressure raising slow in pressure terms?
Near atmospheric pressure, each kelvin adds only a few kPa.
Allowed ramp?
From the boiler maker's start-up curve for drum and header thickness.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.