Worked example
Example: Illustrative 50 MW at 33 kV. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Line-to-line voltage at the connection | 33.000 kV |
| Grid Thevenin resistance (per phase) | 1.5000 Ω |
| Grid Thevenin reactance (per phase) | 6.0000 Ω |
| Plant rated output | 50.000 MW |
Applying the formula below gives:
| Result | Value |
|---|---|
| Short-circuit level V²/|Z| | 176.08 MVA |
| Short-circuit ratio S_sc/P | 3.5216 |
| X/R ratio | 4.0000 |
| Approximate voltage rise at full export, unity power factor | 6.8871 % |
Open this example in the calculator and change any input.
Formula
\(S_{sc} = \frac{V^2}{|Z|}, \quad SCR = \frac{S_{sc}}{P}\)
Variables
| Symbol | Meaning | SI unit | ||
|---|---|---|---|---|
| \(V\) | Line-to-line voltage at the connection | V | ||
| \(R\) | Grid Thevenin resistance (per phase) | Ω | ||
| \(X\) | Grid Thevenin reactance (per phase) | Ω | ||
| \(P\) | Plant rated output | W | ||
| \(S_{sc}\) | Short-circuit level V²/ | Z | VA | |
| \(SCR\) | Short-circuit ratio S_sc/P | - | ||
| \(X/R\) | X/R ratio | - | ||
| \(\Delta V/V\) | Approximate voltage rise at full export, unity power factor | - |
Method and standards
Grid strength.
Where it is used
- Renewable grid connection studies.
- Inverter settings and grid-forming needs.
Common mistakes
- Using the maximum fault level for the weakest-grid case.
- Mixing per-phase and three-phase quantities.
Assumptions and limits
- Thevenin equivalent; steady state.
References
- Short-circuit level and short-circuit ratio
Questions and answers
What does a low SCR mean?
The grid is weak relative to the plant: its voltage swings with the plant's output and inverters can become unstable.
Why does X/R matter?
High X/R grids respond to reactive power control; low X/R (cable-rich) grids respond more to active power.
What do the defaults represent?
An illustrative 50 MW plant at 33 kV behind a grid impedance of 1.5 + j6 Ω.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 3