kVAh Billing: Bill Saving from Power Factor Improvement

Monthly kVAh drawn and bill under kVAh billing at the present and an improved power factor, the saving, and the capacitor kvar needed at the average load.

Thermal power plantProcess steam and utilities

Inputs

Examples: Illustrative 150 MWh at 0.88 to 0.99Small unit 20 MWh at 0.8 to 0.95Already good 0.97 to 1.0

Accepted: 1 to 1E+9
Accepted: 30 to 100 %
Accepted: 30 to 100 %
Accepted: 0 to 1,000
Accepted: 1 to 1,000,000 kW

Results

Under kVAh billing every unit of reactive energy is paid for: kVAh = kWh/pf. Leading power factor counts as lagging under most kVAh tariffs, so avoid over-compensation at light load; use automatic capacitor banks.

kVAh at present power factor170,455
kVAh at improved power factor151,515
Present bill1,448,864
Monthly saving160,985
Capacitor size at the average load119.18kvar

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 150 MWh at 0.88 to 0.99. The inputs, in the units selected above:

InputValue
Monthly energy (kWh)150,000 -
Present average power factor88.000 %
Improved power factor99.000 %
Tariff per kVAh8.5000 -
Average load300.00 kW

Applying the formula below gives:

ResultValue
kVAh at present power factor170,455
kVAh at improved power factor151,515
Present bill1,448,864
Monthly saving160,985
Capacitor size at the average load119.18 kvar

Open this example in the calculator and change any input.

Formula

\(E_S = \frac{E}{pf}, \quad \Delta B = cE\left(\frac{1}{pf_1} - \frac{1}{pf_2}\right), \quad Q_c = P(\tan\varphi_1 - \tan\varphi_2)\)

Variables

Symbol Meaning SI unit
\(E\) Monthly energy (kWh) -
\(pf_1\) Present average power factor -
\(pf_2\) Improved power factor -
\(c\) Tariff per kVAh -
\(P\) Average load W
\(E_{S,1}\) kVAh at present power factor -
\(E_{S,2}\) kVAh at improved power factor -
\(B_1\) Present bill -
\(\Delta B\) Monthly saving -
\(Q_c\) Capacitor size at the average load var

Method and standards

kVAh billing.

Where it is used

  • Industrial tariff savings studies.
  • Capacitor bank business cases.

Common mistakes

  • Comparing kWh tariffs with kVAh tariffs directly.
  • Sizing capacitors for peak instead of average load.

Assumptions and limits

  • Average power factor over the month.

References

  • Apparent-energy billing

Questions and answers

How much does 0.88 to 0.99 save under kVAh billing?

About 11 % of the energy bill, since kVAh falls in proportion to 1/pf.

Why avoid leading power factor?

Over-compensation raises kVAh again, and many tariffs treat leading as lagging; it can also raise voltage at light load.

What do the defaults represent?

An illustrative factory using 150,000 kWh a month at an average 300 kW, power factor 0.88 raised to 0.99, tariff 8.5 per kVAh.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Pansini, Electrical Distribution Engineering, 3rd ed. (Fairmont, 2007)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.