Mill Feed and Delivery Openings from Ratios (Hugot)

Feed opening, empty delivery and empty feed settings of a mill from its working delivery opening and Hugot's ratios m (feed/delivery) and ψ (empty/working).

Sugar mill and cogeneration

Inputs

Examples: Second millFirst mill after crusher

Hugot (Java practice): first mill 2.2 after a crusher (2.6 without), then 1.9, 1.8, 1.7.
Hugot: crusher 0.6, first mill 0.5, second 0.4, intermediate 0.35, penultimate 0.3, final 0.25.

Results

The empty feed opening is for vertical housings; for inclined housings apply Hugot's correction (eqn 13.10).

Add 1–2 mm for new rollers and 3–4 mm for worn ones, as Hugot advises, before setting the mill.

Working feed opening39.900mm
Empty (setting) delivery opening8.4000mm
Empty (setting) feed opening, vertical housings27.300mm

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Second mill. The inputs, in the units selected above:

InputValue
Working delivery opening21.000 mm
Feed / delivery opening ratio1.9000 -
Empty / working delivery opening0.40000 -

Applying the formula below gives:

ResultValue
Working feed opening39.900 mm
Empty (setting) delivery opening8.4000 mm
Empty (setting) feed opening, vertical housings27.300 mm

Open this example in the calculator and change any input.

Formula

\(E_A = m\,e_A, \quad s_0 = \psi\,e_A, \quad E_0 = s_0 + E_A - e_A\)

Variables

Symbol Meaning SI unit
\(e_A\) Working delivery opening m
\(m\) Feed / delivery opening ratio -
\(\psi\) Empty / working delivery opening -
\(E_A\) Working feed opening m
\(s_0\) Empty (setting) delivery opening m
\(E_0\) Empty (setting) feed opening, vertical housings m

Method and standards

Hugot's setting ratios.

Where it is used

  • Setting mills at the start of season.
  • Checking settings after re-grooving.

Common mistakes

  • Using the empty opening as the working opening.
  • Forgetting wear allowances.

Assumptions and limits

  • Vertical housings; inclined housings need the correction of Hugot eqn 13.10.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 13
  • eqns 13.6–13.7 and Tables 13.2–13.4
  • pp. 205–214

Questions and answers

Why is the feed opening larger?

Bagasse enters loose and leaves compressed; the feed opening must pass the uncompressed blanket.

What is the empty setting?

The opening with the mill stopped and empty; under load the top roller lifts and opens it.

Where do the ratios come from?

Practice in Java, Hawaii and Europe as tabulated by Hugot.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.