Finned Tube Fin Efficiency and Effective Area

Fin efficiency of annular (circular) fins by Schmidt's approximation, the overall surface efficiency and the effective area per metre of finned tube.

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliserBoilerEconomiser and air preheater

Inputs

Examples: HRSG economiser: 50.8 mm tube, 88.9 mm fins, 1.2 mm, 4 mm pitch, h 60, steel 45Air heater finned tube: 38 mm, 70 mm fins, 1 mm, 5 mm pitch, h 40, steel 45Stainless fins: 31.8 mm, 57 mm, 0.8 mm, 3.6 mm pitch, h 80, k 16

Results

Fin efficiency53.614%
Overall surface efficiency56.909%
Total outside area per metre of tube1.0939m²
Effective area per metre of tube0.62253m²
Area ratio to the bare tube10.950

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: HRSG economiser: 50.8 mm tube, 88.9 mm fins, 1.2 mm, 4 mm pitch, h 60, steel 45. The inputs, in the units selected above:

InputValue
Gas-side heat transfer coefficient60.000 W/(m²·K)
Fin thermal conductivity45.000 W/(m·K)
Fin thickness1.2000 mm
Tube outside diameter50.800 mm
Fin outside diameter88.900 mm
Fin pitch (centre to centre)4.0000 mm

Applying the formula below gives:

ResultValue
Fin efficiency72.368 %
Overall surface efficiency73.719 %
Total outside area per metre of tube2.2857 m²
Effective area per metre of tube1.6850 m²
Area ratio to the bare tube14.322

Open this example in the calculator and change any input.

Formula

\(m = \sqrt{\frac{2h}{k\,t}} \qquad \phi = \left(\frac{r_{ec}}{r_b} - 1\right)\left(1 + 0.35\ln\frac{r_{ec}}{r_b}\right) \qquad \eta_f = \frac{\tanh(m r_b \phi)}{m r_b \phi}\)

\(\eta_o = 1 - \frac{A_f}{A}(1 - \eta_f) \qquad A = A_f + A_b\)

Variables

Symbol Meaning SI unit
\(h\) gas-side coefficient W/(m²·K)
\(k\) fin conductivity W/(m·K)
\(t\) fin thickness m
\(d_o\) tube outside diameter m
\(d_f\) fin outside diameter m
\(s\) fin pitch m
\(\eta_f\) fin efficiency –
\(\eta_o\) overall surface efficiency –
\(A\) total area per metre m²
\(\eta_o A\) effective area per metre m²
\(A/A_b\) area ratio to bare tube –
\(r_b\) fin root radius m
\(r_{ec}\) fin tip radius plus half thickness m
\(A_f\) fin area per metre m²
\(A_b\) exposed tube area per metre m²
\(m\) fin parameter 1/m
\(\phi\) Schmidt geometry factor –

Method and standards

Schmidt's approximation for annular fins of constant thickness with the tip loss included by extending the radius by half the thickness; areas per metre of tube.

Where it is used

  • HRSG and economiser design with finned tubes.
  • Comparing fin heights, thicknesses and materials.
  • Effective area for U and LMTD calculations.

Common mistakes

  • Using the total finned area without the efficiency.
  • Using serrated-fin data for solid fins.
  • Ignoring fouling between closely spaced fins in dirty gas.

Assumptions and limits

  • Solid annular fins of uniform thickness; uniform h; no contact resistance at the fin root.
  • Serrated (segmented) fins, common in HRSGs, have a different efficiency and are not covered.

References

  • T.E. Schmidt (1949) approximation for annular fins

Questions and answers

How efficient are economiser fins?

50.8 mm tubes with 88.9 mm steel fins 1.2 mm thick at 4 mm pitch, with a gas coefficient of 60 W/(m²·K), have a fin efficiency of 72 % and an overall surface efficiency of 74 %; each metre carries 2.29 m², 14 times the bare tube.

Why does fin efficiency fall?

Taller, thinner fins and higher gas coefficients make the fin tip much colder than its root, so the tip transfers less heat.

Stainless or carbon steel fins?

Stainless resists corrosion but conducts heat about three times worse, so its fins are less efficient at the same size.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.