Power System Inertia and Rate of Change of Frequency (RoCoF)

Stored rotating energy, initial rate of change of frequency after losing generation and the time to reach a frequency limit without response, from system inertia.

Thermal power plant

Inputs

Examples: Illustrative 30 GVA, H 4 s, 1320 MW lossIsland grid 3 GVA, H 3 s, 300 MWLow inertia 20 GVA, H 2 s, 1800 MW, 60 Hz

Accepted: 1 to 1,000,000 MVA
Accepted: 0.5 to 15 s
Accepted: 0.001 to 100,000 MW
Accepted: 40 to 70 Hz
Accepted: 0.01 to 5 Hz

Results

Swing equation for the whole system right after the loss: df/dt = ΔP f₀/(2HS). Wind, solar and batteries behind inverters add no inertia unless they provide synthetic inertia, so RoCoF rises as they displace synchronous machines; load damping and governor response then arrest the fall.

Stored kinetic energy40.000GJ
Initial rate of change of frequency (Hz/s)1.3500
Time to reach the deviation limit without response0.37037s
Inertia constant needed to keep RoCoF at 1 Hz/s2.7000s

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 30 GVA, H 4 s, 1320 MW loss. The inputs, in the units selected above:

InputValue
Rating of synchronous machines online30,000 MVA
Average inertia constant4.0000 s
Generation lost1,320.0 MW
Nominal frequency50.000 Hz
Frequency deviation limit (for the time)0.80000 Hz

Applying the formula below gives:

ResultValue
Stored kinetic energy120.00 GJ
Initial rate of change of frequency (Hz/s)0.27500
Time to reach the deviation limit without response2.9091 s
Inertia constant needed to keep RoCoF at 1 Hz/s1.1000 s

Open this example in the calculator and change any input.

Formula

\(E_k = HS, \quad \frac{df}{dt} = \frac{\Delta P f_0}{2HS}\)

Variables

Symbol Meaning SI unit
\(S\) Rating of synchronous machines online VA
\(H\) Average inertia constant s
\(\Delta P\) Generation lost W
\(f_0\) Nominal frequency 1/s
\(\Delta f\) Frequency deviation limit (for the time) 1/s
\(E_k\) Stored kinetic energy J
\(df/dt\) Initial rate of change of frequency (Hz/s) -
\(t\) Time to reach the deviation limit without response s
\(H_{min}\) Inertia constant needed to keep RoCoF at 1 Hz/s s

Method and standards

System inertia.

Where it is used

  • Grid planning with high renewable shares.
  • Sizing fast frequency response and synthetic inertia.

Common mistakes

  • Counting inverter-based plant in S.
  • Using the post-response frequency nadir instead of the initial RoCoF.

Assumptions and limits

  • Single-area system; first instant after the loss.

References

  • Aggregate swing equation of a power system

Questions and answers

Why does inertia fall with more renewables?

Inverter-connected wind and solar do not have rotating masses coupled to the grid, so the kinetic energy that slows the first frequency drop shrinks.

What RoCoF limits are used?

Many grids plan for 0.5–1 Hz/s; protection relays on some distributed generators trip above about 0.5–1 Hz/s.

What do the defaults represent?

An illustrative 30 GVA of synchronous machines with H = 4 s losing a 1,320 MW unit on a 50 Hz grid, with a 0.8 Hz deviation limit.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 3

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.