Centrifugal Cleaner Stage Balance

Reject flow, accept consistency, mass and volume reject ratios and fibre loss of a stage of centrifugal (forward) cleaners from feed and reject data.

Pulp and paper

Inputs

Examples: 1200 m3/h at 0.8 %, 15 % rejectsSecond stage

Results

Forward cleaners are run in cascade so the rejects of each stage are re-cleaned; only the last stage's rejects leave the system.

Reject flow60.000m³/h
Accept consistency1.00000%
Mass reject ratio33.333%
Fibre to rejects (OD)28.800t/d

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1200 m3/h at 0.8 %, 15 % rejects. The inputs, in the units selected above:

InputValue
Feed flow1,200.0 m³/h
Feed consistency0.80000 %
Volumetric reject ratio15.000 %
Reject consistency1.2000 %
Stock density1,000.0 kg/m³

Applying the formula below gives:

ResultValue
Reject flow180.00 m³/h
Accept consistency0.72941 %
Mass reject ratio22.500 %
Fibre to rejects (OD)51.840 t/d

Open this example in the calculator and change any input.

Formula

\(\dot V_R = R_V\dot V_F, \quad C_A = \frac{\dot V_F C_F - \dot V_R C_R}{\dot V_F - \dot V_R}, \quad R_M = \frac{\dot V_R C_R}{\dot V_F C_F}\)

Variables

Symbol Meaning SI unit
\(\dot V_F\) Feed flow m³/s
\(C_F\) Feed consistency -
\(R_V\) Volumetric reject ratio -
\(C_R\) Reject consistency -
\(\rho\) Stock density kg/m³
\(\dot V_R\) Reject flow m³/s
\(C_A\) Accept consistency -
\(R_M\) Mass reject ratio -
\(\dot m_{R,OD}\) Fibre to rejects (OD) kg/s

Method and standards

Volume and fibre balances.

Where it is used

  • Cleaner plant design and audits.

Common mistakes

  • Mixing mass and volume reject ratios.

Assumptions and limits

  • Stock density constant across streams.

References

  • Smook
  • Handbook for Pulp & Paper Technologists
  • 3rd ed. (Angus Wilde, 2002)
  • ch. 9.5 (centrifugal cleaning)

Questions and answers

What reject ratio is typical?

10–20 % by volume on the first stage.

Why does reject consistency matter?

Thick rejects plug the cleaner tips; Smook suggests checking for this when efficiency drops.

How is fibre loss kept low?

By cascading stages and sending only the last stage's rejects to waste.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.