Worked example
Example: 80 g/m2, 8.5 m, 1200 m/min. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Basis weight (grammage) | 80.000 g/m² |
| Trim width at the reel | 8.5000 m |
| Machine (reel) speed | 1,200.0 m/min |
| Time efficiency | 92.000 % |
| Saleable share (after broke) | 94.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Reel production while running | 48.960 t/h |
| Net saleable production | 1,016.2 t/d |
| Annual production (365 days) | 370,904 t |
Open this example in the calculator and change any input.
Formula
\(P_h = BW \cdot W \cdot v, \quad P_d = P_h\,\eta_t\,\eta_s, \quad P_a = P_d \times 365\ \mathrm{d}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(BW\) | Basis weight (grammage) | kg/m² |
| \(W\) | Trim width at the reel | m |
| \(v\) | Machine (reel) speed | m/s |
| \(\eta_t\) | Time efficiency | - |
| \(\eta_s\) | Saleable share (after broke) | - |
| \(P_h\) | Reel production while running | kg/s |
| \(P_d\) | Net saleable production | kg/s |
| \(P_a\) | Annual production (365 days) | kg |
Method and standards
Production definition.
Where it is used
- Capacity planning.
- Speed-up studies.
Common mistakes
- Using wire width instead of trim width.
- Mixing reel and winder speeds.
Assumptions and limits
- Basis weight as produced (with moisture): the tonnes are as-made paper at reel moisture, not oven-dry. Convert with the moisture content to compare with an oven-dry (OD) figure.
References
- Smook
- Handbook for Pulp & Paper Technologists
- 3rd ed. (Angus Wilde, 2002)
- ch. 16 and 21 (paper machine operation; production = basis weight × width × speed)
Questions and answers
What is trim width?
The width of saleable paper at the reel after edge trims.
Why separate time efficiency and broke?
Downtime stops production; broke is produced but re-pulped.
What does 80 g/m², 8.5 m and 1,200 m/min give?
About 49 t/h on the reel, or roughly 1,000 t/d net at 92 % and 94 %.