Worked example
Example: 2000 m3 HD tower at 12 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Working volume | 2,000.0 m³ |
| Storage consistency | 12.000 % |
| Stock density | 1,000.0 kg/m³ |
| Pulp production (oven-dry) | 500.00 t/d |
Applying the formula below gives:
| Result | Value |
|---|---|
| Fibre in storage (OD) | 240.00 t |
| Hours of storage | 11.520 h |
Open this example in the calculator and change any input.
Formula
\(M_{OD} = V\rho C, \quad t = \frac{M_{OD}}{\dot m_{OD}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | Working volume | m³ |
| \(C\) | Storage consistency | - |
| \(\rho\) | Stock density | kg/m³ |
| \(\dot m_{OD}\) | Pulp production (oven-dry) | kg/s |
| \(M_{OD}\) | Fibre in storage (OD) | kg |
| \(t\) | Hours of storage | s |
Method and standards
Fibre inventory.
Where it is used
- Tower sizing.
- Production planning.
Common mistakes
- Using total instead of working volume.
Assumptions and limits
- Uniform consistency.
References
- Smook
- Handbook for Pulp & Paper Technologists
- 3rd ed. (Angus Wilde, 2002)
- ch. 9.8 (stock storage)
Questions and answers
Why store at high consistency?
A 12 % tower holds three times the fibre of a 4 % chest of the same size.
How much storage is usual?
8–24 hours between pulp mill and paper machine.
Is the whole volume usable?
No: use the working volume between minimum and maximum levels.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.