Stock Storage Tower: Hours of Storage

Hours of storage and fibre inventory in a stock or pulp storage tower from its working volume, stored consistency and the production it supplies.

Pulp and paperTank and drum

Inputs

Examples: 2000 m3 HD tower at 12 %Machine chest 300 m3 at 3.5 %

Results

Fibre in storage (OD)240.00t
Hours of storage11.520h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 2000 m3 HD tower at 12 %. The inputs, in the units selected above:

InputValue
Working volume2,000.0 m³
Storage consistency12.000 %
Stock density1,000.0 kg/m³
Pulp production (oven-dry)500.00 t/d

Applying the formula below gives:

ResultValue
Fibre in storage (OD)240.00 t
Hours of storage11.520 h

Open this example in the calculator and change any input.

Formula

\(M_{OD} = V\rho C, \quad t = \frac{M_{OD}}{\dot m_{OD}}\)

Variables

Symbol Meaning SI unit
\(V\) Working volume m³
\(C\) Storage consistency -
\(\rho\) Stock density kg/m³
\(\dot m_{OD}\) Pulp production (oven-dry) kg/s
\(M_{OD}\) Fibre in storage (OD) kg
\(t\) Hours of storage s

Method and standards

Fibre inventory.

Where it is used

  • Tower sizing.
  • Production planning.

Common mistakes

  • Using total instead of working volume.

Assumptions and limits

  • Uniform consistency.

References

  • Smook
  • Handbook for Pulp & Paper Technologists
  • 3rd ed. (Angus Wilde, 2002)
  • ch. 9.8 (stock storage)

Questions and answers

Why store at high consistency?

A 12 % tower holds three times the fibre of a 4 % chest of the same size.

How much storage is usual?

8–24 hours between pulp mill and paper machine.

Is the whole volume usable?

No: use the working volume between minimum and maximum levels.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.