Worked example
Example: 18 m head, 12 mm slice. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Total head at the slice (as stock) | 18.000 m |
| Slice opening | 12.000 mm |
| Jet contraction coefficient | 65.000 % |
| Slice width | 9.0000 m |
| Wire speed | 1,200.0 m/min |
| Headbox consistency | 0.60000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Jet velocity | 1,127.4 m/min |
| Jet-to-wire ratio | 0.93947 |
| Rush (+) or drag (−) | -72.639 m/min |
| Headbox flow | 4,748.4 m³/h |
| Fibre in the jet | 28.491 t/h |
Open this example in the calculator and change any input.
Formula
\(v_j = \sqrt{2gh}, \quad Q = v_j\,b\,C_c\,W, \quad \frac{v_j}{v_w}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(h\) | Total head at the slice (as stock) | m |
| \(b\) | Slice opening | m |
| \(C_c\) | Jet contraction coefficient | - |
| \(W\) | Slice width | m |
| \(v_w\) | Wire speed | m/s |
| \(C\) | Headbox consistency | - |
| \(v_j\) | Jet velocity | m/s |
| \(v_j/v_w\) | Jet-to-wire ratio | - |
| \(v_j - v_w\) | Rush (+) or drag (−) | m/s |
| \(Q\) | Headbox flow | m³/s |
| \(\dot m_{OD}\) | Fibre in the jet | kg/s |
Method and standards
Bernoulli jet as given by Smook.
Where it is used
- Headbox setting and grade changes.
Common mistakes
- Using gauge pressure in kPa as head without conversion.
- Ignoring jet contraction.
Assumptions and limits
- No losses in the slice; stock density about 1 000 kg/m³. Real jets run about 1–3 % slower than √(2gh) because of a velocity coefficient that is not applied here; since the jet-to-wire ratio is tuned within a few per cent of 1, calibrate against a measured jet speed.
References
- Smook
- Handbook for Pulp & Paper Technologists
- 3rd ed. (Angus Wilde, 2002)
- ch. 16.3 (headbox: jet speed from Bernoulli, v = √(2gh); jet contraction)
Questions and answers
Why total head?
Pond level plus air-cushion pressure (as stock height) drives the jet.
What is jet contraction?
The jet is thinner than the slice opening; Smook notes it must be allowed for when computing flow.
What head gives 1,200 m/min?
About 20 m of stock.