Make-up water a boiler house needs from the steam flow, blowdown, condensate returned and other losses, with the feed water flow and daily volume.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paperFood, dairy and textileBoilerDeaerator and feedwater system

Inputs

Examples: 20 t/h, 5 % blowdown, 60 % condensate return, 2 % lossesPower plant 300 t/h, 1 % blowdown, 97 % return, 0.5 % lossesProcess boiler 10 t/h, no condensate return, 4 % blowdown

Results

Make-up water flow10,400kg/h
Make-up as a share of feed water100.00%
Make-up water per day250.10m³
Feed water flow10,400kg/h
Condensate returned0kg/h
Blowdown400.00kg/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 20 t/h, 5 % blowdown, 60 % condensate return, 2 % losses. The inputs, in the units selected above:

InputValue
Steam generated20,000 kg/h
Blowdown, as a share of steam5.0000 %
Condensate returned, as a share of the steam reaching the users60.000 %
Other losses, as a share of steam (vents, traps, leaks, soot blowing)2.0000 %
Make-up water density (for the daily volume)998.00 kg/m³

Applying the formula below gives:

ResultValue
Make-up water flow9,240.0 kg/h
Make-up as a share of feed water44.000 %
Make-up water per day222.20 m³
Feed water flow21,000 kg/h
Condensate returned11,760 kg/h
Blowdown1,000.0 kg/h

Open this example in the calculator and change any input.

Formula

\(B = b\,S \qquad C = r\,S\,(1 - l) \qquad F = S + B \qquad M = F - C = B + l\,S + (1 - r)(1 - l)\,S \qquad V_d = \frac{M \cdot 86\,400\ \text{s}}{\rho}\)

Variables

Symbol Meaning SI unit
\(S\) steam generated kg/s
\(b\) blowdown as a share of steam –
\(r\) condensate returned as a share of the steam reaching the users, \(S(1 - l)\) –
\(l\) other losses as a share of steam –
\(\rho\) make-up water density kg/m³
\(M\) make-up water flow kg/s
\(M/F\) make-up as a share of feed water –
\(V_d\) make-up water per day m³
\(F\) feed water flow kg/s
\(C\) condensate returned kg/s
\(B\) blowdown kg/s

Method and standards

Steady-state mass balance on the feed water system: water leaves as steam that is not returned, as blowdown and as losses; make-up replaces it.

Where it is used

  • Sizing water treatment plants and make-up pumps.
  • Water budgets for boiler houses.
  • Checking condensate return performance.

Common mistakes

  • Forgetting blowdown, vent and soot-blowing losses.
  • Counting returned condensate twice.
  • Using design condensate return where actual return is lower.

Assumptions and limits

  • Deaerator heating steam is taken from the boiler's own steam and returns in the feed water, so it does not change the make-up.
  • Blowdown and other losses are shares of all the steam generated, deaerator steam included. The losses leave on the steam side, so the users receive \(S(1 - l)\) and the condensate return is a share of that.
  • Steady state; storage changes are ignored.
  • Water treatment plant losses (regeneration, reject) are upstream of the make-up and not included.

References

  • Mass balance on the feed water system

Questions and answers

How much make-up water does a boiler need?

Make-up = blowdown + other losses + condensate not returned, which equals feed water − condensate returned. A 20 t/h boiler with 5 % blowdown, 2 % losses and 60 % condensate return needs 9.24 t/h of make-up, 44 % of its feed water.

Why does a power plant need so little?

Nearly all its steam returns as condensate. With 97 % return, 1 % blowdown and 0.5 % other losses, a 300 t/h unit needs about 13.5 t/h.

What are the other losses?

Deaerator vents, trap and drain losses, leaks, soot-blowing and atomising steam, sampling. Enter them as a share of steam.

Method and article reviewed by FireCAD engineering on 10 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.