Deaerator Elevation for Feed Pump NPSH

Minimum height of the deaerator water level above the boiler feed pump for its NPSH required, margin, suction losses and a transient allowance.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paperFood, dairy and textileHydraulic Institute (pumps)BoilerDeaerator and feedwater systemPump

Inputs

Examples: NPSHr 6 m, ratio 1.3, losses 0.8 m, allowance 1 m, actual 12 mNPSHr 3.5 m, ratio 1.1, losses 0.5 mNPSHr 9 m, ratio 1.5, losses 1.2 m, allowance 2 m, actual 15 m

ANSI/HI 9.6.1 gives margin ratios by application; enter the ratio your specification or the pump maker requires.
On a sudden load drop the deaerator pressure falls faster than the water in the suction line cools; enter the allowance your transient study or specification gives.

Results

The elevation is below the minimum: raise the deaerator or choose a pump (or booster pump) with a lower NPSH required.

Minimum water level above the pump centreline16.700m
NPSH available at the actual elevation13.800m
Margin ratio at the actual elevation1.5333
Height to spare (negative = too low)-1.7000m

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: NPSHr 6 m, ratio 1.3, losses 0.8 m, allowance 1 m, actual 12 m. The inputs, in the units selected above:

InputValue
NPSH required by the feed pump at the highest flow6.0000 m
NPSH margin ratio NPSHa / NPSHr1.3000 -
Suction line losses at the highest flow (incl. strainer)0.80000 m
Allowance for pressure decay on load rejection1.0000 m
Actual or proposed elevation to check (0 = skip)12.000 m

Applying the formula below gives:

ResultValue
Minimum water level above the pump centreline9.6000 m
NPSH available at the actual elevation11.200 m
Margin ratio at the actual elevation1.8667
Height to spare (negative = too low)2.4000 m

Open this example in the calculator and change any input.

Formula

With saturated water the pressure head is zero, so \(NPSH_a = z - h_{fs}\) and

\(z_{min} = NPSH_r\,R + h_{fs} + h_t \qquad NPSH_a = z_{act} - h_{fs} \qquad \Delta z = z_{act} - z_{min}\)

Variables

Symbol Meaning SI unit
\(NPSH_r\) NPSH required at the highest flow m
\(R\) margin ratio \(NPSH_a / NPSH_r\) –
\(h_{fs}\) suction line losses at the highest flow m
\(h_t\) allowance for pressure decay on load rejection m
\(z_{act}\) actual or proposed elevation m
\(z_{min}\) minimum water level above the pump centreline m
\(NPSH_a\) NPSH available at the actual elevation m
\(NPSH_a/NPSH_r\) margin ratio at the actual elevation –
\(\Delta z\) height to spare m

Method and standards

NPSH available as defined in ANSI/HI 9.6.1, for saturated water whose vapour pressure equals the vessel pressure. The margin ratio is the form ANSI/HI 9.6.1 uses; its value is your input.

Where it is used

  • Setting deaerator height above boiler feed pumps.
  • Checking an existing layout for a larger pump.
  • Transient (pressure decay) checks of NPSH.

Common mistakes

  • Treating the deaerator pressure as extra suction head: saturated water gives none.
  • Ignoring the pressure drop of strainers and suction lines.
  • Using the pump's NPSH required without a margin.

Assumptions and limits

  • Water saturated at the deaerator pressure; subcooled water (from a cooler in the suction) gives more NPSH.
  • Lowest normal water level in the deaerator is the design level.
  • Losses at the highest flow, including strainers (take the dirty-strainer loss for safety).
  • The minimum elevation includes the load-rejection allowance; the NPSH available and margin ratio at the actual elevation are steady-state values without it, so compare the height to spare, not the ratio alone, with the transient case.
  • The suction velocity head and the difference between the pump centreline and the impeller eye are neglected; a first estimate.
  • An elevation of 0 means "not checked"; a pump level with the water has no NPSH available in any case.

References

  • ANSI/HI 9.6.1 (NPSH margin)

Questions and answers

How high must a deaerator be above the feed pump?

The water in a deaerator is saturated, so all the NPSH comes from height. With NPSHr 6 m, a margin ratio of 1.3, 0.8 m of suction losses and 1 m allowance for load rejection, the water level must be at least 9.6 m above the pump.

What is the load-rejection allowance?

When load drops suddenly the deaerator pressure falls, but the water already in the suction pipe is still at the old, higher saturation temperature. NPSH falls until it is replaced. The allowance comes from a transient study or your specification.

What if the deaerator cannot be raised?

Use a low-speed booster pump with low NPSH required ahead of the main feed pump, or a pump with a lower NPSHr.

Method and article reviewed by FireCAD engineering on 10 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.