Worked example
Example: NPSHr 6 m, ratio 1.3, losses 0.8 m, allowance 1 m, actual 12 m. The inputs, in the units selected above:
| Input | Value |
|---|---|
| NPSH required by the feed pump at the highest flow | 6.0000 m |
| NPSH margin ratio NPSHa / NPSHr | 1.3000 - |
| Suction line losses at the highest flow (incl. strainer) | 0.80000 m |
| Allowance for pressure decay on load rejection | 1.0000 m |
| Actual or proposed elevation to check (0 = skip) | 12.000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Minimum water level above the pump centreline | 9.6000 m |
| NPSH available at the actual elevation | 11.200 m |
| Margin ratio at the actual elevation | 1.8667 |
| Height to spare (negative = too low) | 2.4000 m |
Open this example in the calculator and change any input.
Formula
With saturated water the pressure head is zero, so \(NPSH_a = z - h_{fs}\) and
\(z_{min} = NPSH_r\,R + h_{fs} + h_t \qquad NPSH_a = z_{act} - h_{fs} \qquad \Delta z = z_{act} - z_{min}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(NPSH_r\) | NPSH required at the highest flow | m |
| \(R\) | margin ratio \(NPSH_a / NPSH_r\) | – |
| \(h_{fs}\) | suction line losses at the highest flow | m |
| \(h_t\) | allowance for pressure decay on load rejection | m |
| \(z_{act}\) | actual or proposed elevation | m |
| \(z_{min}\) | minimum water level above the pump centreline | m |
| \(NPSH_a\) | NPSH available at the actual elevation | m |
| \(NPSH_a/NPSH_r\) | margin ratio at the actual elevation | – |
| \(\Delta z\) | height to spare | m |
Method and standards
NPSH available as defined in ANSI/HI 9.6.1, for saturated water whose vapour pressure equals the vessel pressure. The margin ratio is the form ANSI/HI 9.6.1 uses; its value is your input.
Where it is used
- Setting deaerator height above boiler feed pumps.
- Checking an existing layout for a larger pump.
- Transient (pressure decay) checks of NPSH.
Common mistakes
- Treating the deaerator pressure as extra suction head: saturated water gives none.
- Ignoring the pressure drop of strainers and suction lines.
- Using the pump's NPSH required without a margin.
Assumptions and limits
- Water saturated at the deaerator pressure; subcooled water (from a cooler in the suction) gives more NPSH.
- Lowest normal water level in the deaerator is the design level.
- Losses at the highest flow, including strainers (take the dirty-strainer loss for safety).
- The minimum elevation includes the load-rejection allowance; the NPSH available and margin ratio at the actual elevation are steady-state values without it, so compare the height to spare, not the ratio alone, with the transient case.
- The suction velocity head and the difference between the pump centreline and the impeller eye are neglected; a first estimate.
- An elevation of 0 means "not checked"; a pump level with the water has no NPSH available in any case.
References
- ANSI/HI 9.6.1 (NPSH margin)
Questions and answers
How high must a deaerator be above the feed pump?
The water in a deaerator is saturated, so all the NPSH comes from height. With NPSHr 6 m, a margin ratio of 1.3, 0.8 m of suction losses and 1 m allowance for load rejection, the water level must be at least 9.6 m above the pump.
What is the load-rejection allowance?
When load drops suddenly the deaerator pressure falls, but the water already in the suction pipe is still at the old, higher saturation temperature. NPSH falls until it is replaced. The allowance comes from a transient study or your specification.
What if the deaerator cannot be raised?
Use a low-speed booster pump with low NPSH required ahead of the main feed pump, or a pump with a lower NPSHr.
Method and article reviewed by FireCAD engineering on 10 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.