Worked example
Example: Perry's Example 18-4 conditions, G 1e-8 m/s. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Crystal growth rate | 1.0000e-08 m/s |
| Drawdown (residence) time | 3.3800 h |
| Slurry density (crystals per volume) | 450.00 g/L |
| Crystal density | 1,335.0 kg/m³ |
| Volume shape factor | 1.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Dominant (mass) size | 0.36504 mm |
| Nuclei population density (number per m³ per m of size, 1/m⁴) | 2.5627e+14 |
| Nucleation rate (number per m³ per second) | 2,562,732 Hz |
| Crystals per m³ of slurry (number per m³) | 3.1183e+10 |
Open this example in the calculator and change any input.
Formula
\(n = n^0 e^{-L/G\tau}, \quad L_D = 3G\tau, \quad M_T = 6k_v\rho_c n^0(G\tau)^4, \quad B^0 = n^0 G\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(G\) | Crystal growth rate | m/s |
| \(\tau\) | Drawdown (residence) time | s |
| \(M_T\) | Slurry density (crystals per volume) | kg/m³ |
| \(\rho_c\) | Crystal density | kg/m³ |
| \(k_v\) | Volume shape factor | - |
| \(L_D\) | Dominant (mass) size | m |
| \(n^0\) | Nuclei population density (number per m³ per m of size) | 1/m⁴ |
| \(B^0\) | Nucleation rate (number per m³ per second) | 1/(m³·s) |
| \(N_T\) | Crystals per m³ of slurry (number per m³) | 1/m³ |
Method and standards
MSMPR population balance (Randolph and Larson).
Where it is used
- Continuous crystalliser design.
- Interpreting sieve analyses.
Common mistakes
- Mixing number and mass distributions.
- Using a classified-product crystalliser.
Assumptions and limits
- Ideal MSMPR; size-independent growth; no breakage.
- n⁰, B⁰ and N_T are shown as plain numbers in SI: n⁰ per m³ per m of size, B⁰ per m³ per second, N_T per m³.
References
- Perry's Chemical Engineers' Handbook
- 9th ed. (McGraw-Hill, 2019)
- sec. 18 (crystallisation): population balance n = n⁰ exp(−L/Gτ)
- Eq. (18-34)
- and Example 18-4
Questions and answers
What is the dominant size?
The size at the peak of the mass distribution, 3Gτ.
How do I get G?
From the slope of ln n against L in a sieve analysis: slope = −1/(Gτ).
Why does slurry density matter?
At a fixed G and τ, more crystals per litre needs more nuclei.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.