Paper Machine Production Rate

Paper machine production in tonnes per day from basis weight, trim (reel) width, machine speed, time efficiency and saleable share, with the dry-end output per hour.

Pulp and paper

Inputs

Examples: 80 g/m2, 8.5 m, 1200 m/minBoard 250 g/m2, 6 m, 600 m/min

Results

Tonnes are as-made paper at reel moisture (the basis weight as produced), not oven-dry.

Reel production while running48.960t/h
Net saleable production1,016.2t/d
Annual production (365 days)370,904t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 80 g/m2, 8.5 m, 1200 m/min. The inputs, in the units selected above:

InputValue
Basis weight (grammage)80.000 g/m²
Trim width at the reel8.5000 m
Machine (reel) speed1,200.0 m/min
Time efficiency92.000 %
Saleable share (after broke)94.000 %

Applying the formula below gives:

ResultValue
Reel production while running48.960 t/h
Net saleable production1,016.2 t/d
Annual production (365 days)370,904 t

Open this example in the calculator and change any input.

Formula

\(P_h = BW \cdot W \cdot v, \quad P_d = P_h\,\eta_t\,\eta_s, \quad P_a = P_d \times 365\ \mathrm{d}\)

Variables

Symbol Meaning SI unit
\(BW\) Basis weight (grammage) kg/m²
\(W\) Trim width at the reel m
\(v\) Machine (reel) speed m/s
\(\eta_t\) Time efficiency -
\(\eta_s\) Saleable share (after broke) -
\(P_h\) Reel production while running kg/s
\(P_d\) Net saleable production kg/s
\(P_a\) Annual production (365 days) kg

Method and standards

Production definition.

Where it is used

  • Capacity planning.
  • Speed-up studies.

Common mistakes

  • Using wire width instead of trim width.
  • Mixing reel and winder speeds.

Assumptions and limits

  • Basis weight as produced (with moisture): the tonnes are as-made paper at reel moisture, not oven-dry. Convert with the moisture content to compare with an oven-dry (OD) figure.

References

  • Smook
  • Handbook for Pulp & Paper Technologists
  • 3rd ed. (Angus Wilde, 2002)
  • ch. 16 and 21 (paper machine operation; production = basis weight × width × speed)

Questions and answers

What is trim width?

The width of saleable paper at the reel after edge trims.

Why separate time efficiency and broke?

Downtime stops production; broke is produced but re-pulped.

What does 80 g/m², 8.5 m and 1,200 m/min give?

About 49 t/h on the reel, or roughly 1,000 t/d net at 92 % and 94 %.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.