Paper Machine Efficiency: Time, Broke and Overall

Time efficiency from downtime, material efficiency from broke and overall machine efficiency, with production lost to downtime (Smook ch. 21).

Pulp and paper

Inputs

Examples: 30 days, 2.4 days downGood month

Results

Time efficiency92.000%
Material efficiency94.000%
Overall efficiency (time × speed × material)83.886%
Saleable production in the period30,510t
Production lost to downtime2,822.4t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 30 days, 2.4 days down. The inputs, in the units selected above:

InputValue
Calendar time in the period720.00 h
Downtime (breaks, shuts, grade changes)57.600 h
Reel production while running49.000 t/h
Broke as a share of reel output6.0000 %
Speed as a share of the design speed97.000 %

Applying the formula below gives:

ResultValue
Time efficiency92.000 %
Material efficiency94.000 %
Overall efficiency (time × speed × material)83.886 %
Saleable production in the period30,510 t
Production lost to downtime2,822.4 t

Open this example in the calculator and change any input.

Formula

\(\eta_t = \frac{T - T_d}{T}, \quad \eta_m = 1 - B, \quad \eta_o = \eta_t\,\eta_m\,P_s\)

Variables

Symbol Meaning SI unit
\(T\) Calendar time in the period s
\(T_d\) Downtime (breaks, shuts, grade changes) s
\(P_r\) Reel production while running kg/s
\(B\) Broke as a share of reel output -
\(P_s\) Speed as a share of the design speed -
\(\eta_t\) Time efficiency -
\(\eta_m\) Material efficiency -
\(\eta_o\) Overall efficiency (time × speed × material) -
\(M\) Saleable production in the period kg
\(M_d\) Production lost to downtime kg

Method and standards

Efficiency definitions.

Where it is used

  • Monthly KPI reports.
  • Loss trees.

Common mistakes

  • Counting grade changes as running time.
  • Ignoring speed losses.

Assumptions and limits

  • Constant running rate.
  • With the speed above design speed (share over 100 %) the overall efficiency can exceed 100 %; the page flags it.

References

  • Smook
  • Handbook for Pulp & Paper Technologists
  • 3rd ed. (Angus Wilde, 2002)
  • ch. 21 (paper machine efficiency and broke)

Questions and answers

What is good time efficiency?

92–96 % for well-run machines.

Why include speed?

Running slower than design is a hidden loss that time efficiency misses.

Is broke lost?

It is re-pulped, but its drying energy and machine time are lost.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.